A Mathematical Model and Ant Colony Algorithm for Assembly Line Balancing Problem With Human-Robot Collaboration and Alternative Subgraphs

被引:0
|
作者
Ma'ruf, Anas [1 ]
Nugraha, R. Cahyadi [1 ]
Cakravastia, Andi [1 ]
Halim, Abdul Hakim [1 ]
机构
[1] Bandung Inst Technol, Fac Ind Technol, Bandung 40132, Indonesia
来源
IEEE ACCESS | 2024年 / 12卷
关键词
Robots; Task analysis; Assembly; Metaheuristics; Mathematical models; Collaborative robots; Linear programming; Assembly line balancing; human-robot collaboration; mathematical model; metaheuristic; SEARCH;
D O I
10.1109/ACCESS.2024.3437410
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In recent years, the use of collaborative robots in assembly lines has promised productivity improvement. It provides more alternatives for the assembly line design, which are the alternative resources of the human, robot, or human-robot collaboration (HRC), and the alternative subsets of processes, termed alternative subgraphs, taking advantage of the variety of robotic tools or end-effectors. However, more alternatives make the assembly line balancing problem more complex. This situation is encountered frequently in modern electronics and automotive assembly lines. The contribution of this study is to provide a mathematical model and solution to the assembly line balancing problem that has both HRC and alternative subgraphs, which has not been discussed as an integrated problem in previous literature. To accomplish this optimization problem, a mixed-integer linear programming (MILP) model has been developed to assign tasks to stations and determine the type of resources required while minimizing the cycle time. Practical constraints such as the available number of robots and robotic end-effector types are also considered. Owing to the complexity of the problem, the exact method for MILP is extremely time-consuming for real-world applications. Therefore, a metaheuristic algorithm based on the ant colony optimization (ACO) approach has been developed to solve the problem more efficiently. The results show that the MILP model can obtain optimal solutions for small-sized problems, whereas the ACO algorithm has proven to be a practical solution for medium- to large-sized problems, providing good solutions within an acceptable computation time. The results also show that the presence of alternative subgraphs can give opportunities for better solutions.
引用
收藏
页码:107516 / 107528
页数:13
相关论文
共 50 条
  • [1] The fuzzy human-robot collaboration assembly line balancing problem
    Zacharia, Paraskevi Th.
    Xidias, Elias K.
    Nearchou, Andreas C.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 187
  • [2] Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human-robot collaboration
    Cil, Zeynel Abidin
    Li, Zixiang
    Mete, Suleyman
    Ozceylan, Eren
    APPLIED SOFT COMPUTING, 2020, 93
  • [3] A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Fattahi, Parviz
    Roshani, Abdolreza
    Roshani, Abdolhassan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4): : 363 - 378
  • [4] A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Parviz Fattahi
    Abdolreza Roshani
    Abdolhassan Roshani
    The International Journal of Advanced Manufacturing Technology, 2011, 53 : 363 - 378
  • [5] Model and metaheuristic for human-robot collaboration assembly line worker assignment and balancing problem
    Mao, Zhaofang
    Sun, Yiting
    Fang, Kan
    Huang, Dian
    Zhang, Jiaxin
    COMPUTERS & OPERATIONS RESEARCH, 2024, 165
  • [6] The Collaboration of Human-Robot in Mixed-Model Four-Sided Assembly Line Balancing Problem
    Rabbani, Masoud
    Behbahan, Seyedeh Zeinab Beladian
    Farrokhi-Asl, Hamed
    JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 2020, 100 (01) : 71 - 81
  • [7] The Collaboration of Human-Robot in Mixed-Model Four-Sided Assembly Line Balancing Problem
    Masoud Rabbani
    Seyedeh Zeinab Beladian Behbahan
    Hamed Farrokhi-Asl
    Journal of Intelligent & Robotic Systems, 2020, 100 : 71 - 81
  • [8] Erratum to: Note to: a mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Hamid Yilmaz
    Mustafa Yilmaz
    The International Journal of Advanced Manufacturing Technology, 2017, 89 : 1941 - 1941
  • [9] Balancing parallel assembly lines with human-robot collaboration: problem definition, mathematical model and tabu search approach
    Mao, Zhaofang
    Zhang, Jiaxin
    Sun, Yiting
    Fang, Kan
    Huang, Dian
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [10] HUMAN-ROBOT COLLABORATION FOR DISASSEMBLY LINE BALANCING PROBLEM IN REMANUFACTURING
    Liu, Bin
    Xu, Wenjun
    Liu, Jiayi
    Yao, Bitao
    Zhou, Zude
    Duc Truong Pham
    PROCEEDINGS OF THE ASME 14TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2019, VOL 1, 2019,