Measuring the Performance of Industrialized Building System (IBS) Construction on Projects Towards Achieving IR 4.0 in Malaysia- Contractor's Perspective

被引:0
|
作者
Halim, Hazruwani A. [1 ]
Ani, Adi Irfan Che [2 ]
Chohan, Afaq Hyder [3 ]
机构
[1] Univ Kebangsaan Malaysia, Fac Engn & Built Environm, Dept Civil Engn, Bangi, Malaysia
[2] Univ Kebangsaan, Fac Engn & Built Environm, Dept Architecture & Built Environm, Bangi, Malaysia
[3] Ajman Univ, Dept Architecture, Collage Architecture Art & Design, Ajman 346, U Arab Emirates
关键词
Performance; IBS; Construction Industry; Content Validity; Contractor; DELAY;
D O I
10.11113/ijbes.v11.n3.1236
中图分类号
TU98 [区域规划、城乡规划];
学科分类号
0814 ; 082803 ; 0833 ;
摘要
According to prolonged project completion times, excessive costs, and inadequate building products, the majority of construction projects are seen as underperforming. Alternatively, stakeholders are encouraged to move from conventional to Industrialized Building Systems (IBS) in line with today's technology. Previous studies show the performance of IBS practices in the Malaysian construction industry is still at a low level even though the government has diversified promotions and issued instructions for 70% of IBS use in government projects. These selection criteria affect contractors' performance of IBS practices and need to be done in a systematic way, along with current technology trends and sustainability. Content validity in IBS practice performance is an important step in instrument development. Content validity in IBS practice performance is an important step in instrument development. Therefore, this research aims to evaluate the content validity of the performance effectiveness of IBS practices by using the content validity index (CVI) and modified Kappa sensitivity. In an effort to accomplish the objectives of this study, questionnaire was created using construct items that were taken from earlier research projects by various researcher. A panel of selected experts who are experienced in the field of IBS, such as CIDB, JKR and contractors have reviewed and evaluated pig instruments to ensure the relevance of each item. The final instrument contains 39 items that are valid and considered permanent and all items will be tested again in the next study. The results showed that the S-CVI/AVE for every item met every requirement and received an outstanding rating for every assessment.
引用
下载
收藏
页码:13 / 20
页数:8
相关论文
共 9 条
  • [1] The State of Skilled Components Installers for Industrialized Building System (IBS) Construction in Malaysia
    Buyung, N. R.
    Ghani, A. N. Abdul
    BUILDING SURVEYING AND TECHNOLOGY UNDERGRADUATE CONFERENCE, 2014, 10
  • [2] Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia
    Fatah, Mohd Ashraf Mohd
    Mohammad, Mohammad Fadhil
    Abd Shukor, Ani Saifuza
    9TH INTERNATIONAL UNIMAS STEM ENGINEERING CONFERENCE (ENCON 2016) INNOVATIVE SOLUTIONS FOR ENGINEERING AND TECHNOLOGY CHALLENGES, 2017, 87
  • [3] A CAUSE OF COMMUNICATION FAILURE IN MANAGING INDUSTRIALIZED BUILDING SYSTEM (IBS) PROJECTS: A PERSPECTIVE VIEW FROM PROJECT MANAGERS
    Pozin, Mohd Affendi Ahmad
    Nawi, Mohd Nasrun Mohd
    Lee, Angela
    Yaakob, Mazri
    Hanafi, Mohd Hanizun
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2018, 9 (08) : 1523 - 1532
  • [4] Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS) Construction Projects
    Nawi, Mohd Nasrun Mohd
    Nadarajan, Santhisegaran
    Omar, Mohd Faizal
    Zaidi, Mohd Azian
    Yasin, Mohd Fadzil Mat
    BUILDING SURVEYING, FACILITIES MANAGEMENT AND ENGINEERING CONFERENCE (BSFMEC 2014), 2014, 15
  • [5] Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS) Construction Projects
    Nawi, Mohd Nasrun Mohd
    Nadarajan, Santhisegaran
    Omar, Mohd Faizal
    Zaidi, Mohd Azian
    Yasin, Mohd Fadzil Mat
    EMERGING TECHNOLOGY FOR SUSTAINABLE DEVELOPMENT CONGRESS (ETSDC 2014), 2014, 3
  • [6] Developing sustainability assessment indicators for measuring contractor’s performance during the construction phase of construction projects in Jordan
    Alnsour M.
    Zeidan A.
    Al Quwaider B.
    Alkubaisi A.
    Alreqeb R.
    Bader M.
    Asian Journal of Civil Engineering, 2023, 24 (1) : 245 - 266
  • [7] A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia's construction industry
    Amin, M. A. Mohd
    Abas, N. H.
    Shahidan, S.
    Rahmat, M. H.
    Suhaini, N. A.
    Nagapan, S.
    Rahim, R. Abdul
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [8] The Role of the Total-Quality-Management (TQM) Drivers in Overcoming the Challenges of Implementing TQM in Industrialized-Building-System (IBS) Projects in Malaysia: Experts' Perspectives
    Alawag, Aawag Mohsen
    Alaloul, Wesam Salah
    Liew, M. S.
    Baarimah, Abdullah O.
    Musarat, Muhammad Ali
    Al-Mekhlafi, Al-Baraa Abdulrahman
    SUSTAINABILITY, 2023, 15 (08)
  • [9] INDUSTRIALISED BUILDING SYSTEM PERFORMANCE AS COMPARED TO CONVENTIONAL CONSTRUCTION METHOD IN MALAYSIA'S RESIDENTIAL BUILDING
    Osman, Wan Nadzri
    Abdullah, Che Sobry
    Abidin, Rahimi
    KNOWLEDGE MANAGEMENT AND INNOVATION IN ADVANCING ECONOMIES-ANALYSES & SOLUTIONS, VOLS 1-3, 2009, : 708 - 711