Hospital project front-end planning: Current practice and discovered challenges

被引:5
|
作者
Larsen, Anne Strand Alfredsen [1 ,3 ]
Karlsen, Anniken Th [2 ]
Andersen, Bjorn
机构
[1] Aalesund Hosp, More & Romsdal Hosp Trust, Alesund, Norway
[2] Norwegian Univ Sci & Technol, Fac Informat Technol & Elect Engn, Dept ICT & Nat Sci, Trondheim, Norway
[3] Norwegian Univ Sci & Technol, Fac Engn, Dept Mech & Ind Engn, Trondheim, Norway
来源
关键词
Front-end; Hospital projects; Strategic project success; Decision-making; Challenges; Improvement; HEALTH; GOVERNANCE; CARE; MANAGEMENT; QUALITY; BRIEFS; DISEASE; CURE;
D O I
10.1016/j.plas.2020.100004
中图分类号
F [经济];
学科分类号
02 ;
摘要
Development of healthcare services is a societal responsibility often appearing as major public projects. These types of projects often have a long lifetime expectancy and represent large investments and changes to established welfare systems with a considerable societal impact. This makes strategic project success depending on front-end planning performance crucial. Motivated by literature claiming that the hospital projects' front-end phase has a potential for improvements, this paper presents findings from a study investigating front-end planning practice in five Norwegian hospital projects. Discovered challenges mainly relate to the planning process or exploration of the opportunity space and concept elaboration. . A main conclusion is that implementing theoretical recommendations both in guidelines and in practice should be a desired and possible development to further improve hospital projects' front-end planning, thereby strengthening the odds for project success both on a tactical and strategical level.
引用
下载
收藏
页数:14
相关论文
共 50 条
  • [1] 'Enhanced front-end loading' aims for assurance in project planning
    Westney, Richard
    Dahl, Justin
    OIL & GAS JOURNAL, 2019, 117 (06) : 18 - 24
  • [2] Understanding front-end project workshops with Social Practice Theory
    Burger, Katharina
    White, Leroy
    Yearworth, Mike
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2019, 37 (01) : 161 - 175
  • [3] Front-End Electronics of the Neutrinos Angra Project
    Costa, Jose Abritta
    Dornelas, Tony Igor
    Nobrega, Rafael Antunes
    Cerqueira, Augusto Santiago
    2014 IEEE INTERNATIONAL INSTRUMENTATION AND MEASUREMENT TECHNOLOGY CONFERENCE (I2MTC) PROCEEDINGS, 2014, : 1501 - 1505
  • [4] Front-end electronics for the Muon Portal project
    Garozzo, S.
    Marano, D.
    Bonanno, G.
    Grillo, A.
    Romeo, G.
    Timpanaro, M. C.
    Lo Presti, D.
    Riggi, F.
    Russo, V.
    Bonanno, D.
    La Rocca, P.
    Longhitano, F.
    Bongiovanni, D. G.
    Fallica, G.
    Valvo, G.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2016, 833 : 169 - 180
  • [5] Critical activities in the front-end planning process
    George, Ryan
    Bell, Lansford C.
    Back, W. Edward
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2008, 24 (02) : 66 - 74
  • [6] A Front-End for Collaborative Task Planning on the Grid
    Phung, Hoang M.
    Hoang, Doan B.
    Lawrence, Elaine
    PROCEEDINGS OF THE 2009 INTERNATIONAL SYMPOSIUM ON COLLABORATIVE TECHNOLOGIES AND SYSTEMS, 2009, : 292 - 299
  • [7] The client's essential stakeholder collaboration activities at the front-end phase of a hospital construction project
    Tampio, Kari-Pekka
    Haapasalo, Harri
    Lehtinen, Jere
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2023, 16 (08) : 182 - 207
  • [8] Front-end electronics and trigger systems - Status and challenges
    Spieler, Helmuth
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2007, 581 (1-2): : 65 - 79
  • [9] The front-end logistics of DNA barcoding: challenges and prospects
    Borisenko, Alex V.
    Sones, Jayme E.
    Hebert, Paul D. N.
    MOLECULAR ECOLOGY RESOURCES, 2009, 9 : 27 - 34
  • [10] Integration of the Construction Knowledge and Expertise in Front-End Planning
    Oh, Eun Ho
    Naderpajouh, Nader
    Hastak, Makarand
    Gokhale, Sanjiv
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)