Experimental study on shear transfer across interfaces with post-installed shear reinforcement

被引:0
|
作者
Nie, Xin [1 ]
Huang, Da [1 ]
Liu, Tai [1 ]
Fan, Jiansheng [1 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Key Lab Civil Engn Safety & Durabil, China Educ Minist, Beijing 100084, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Precast flooring system; Fit-up issue; Post-installed rebar; Concrete-to-concrete interface; Shear transfer mechanism; CONSTRUCTION; BEHAVIOR;
D O I
10.1016/j.jobe.2024.110812
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To address the fit-up issues arising from reinforcement congestion and limited seating area over precast beams, an improved joint detail characterized by post-installed interface shear reinforcement has been developed. The incorporation of post-installed narrower looped bars as an alternative to conventional protruding stirrups significantly expedites the erection of precast flooring systems. Moreover, direct shear tests are performed on 30 Z-shaped specimens to investigate the influence of joint details, surface roughness, looped bar ratio, and embedment length of post-installed bars on the interface shear behavior. Experimental results indicate that employing post-installed narrower looped bars not only ensures adequate seating length for precast flooring systems, but also prevents the splitting failure of concrete cover which can induce the degradation of dowel action. Sufficient anchorage is the prerequisite for post-installed looped bars to impose clamping stress on concrete interface, and a shallow embedment length may trigger the occurrence of pull-out failure. Surface roughness is another factor determining the interface shear resistance and stiffness. Untreated surfaces, in contrast to intentionally roughened surfaces, are susceptible to the cohesion fracture and may hinder the development of shear-friction action. Furthermore, a linear correlation exists between looped bar ratio and the shear resistance of concrete interface. Based on the experimental results, design recommendations, including the minimum required anchorage length for post-installed looped bars, are proposed for the novel joint detail.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] Enhanced safety with post-installed punching shear reinforcement
    Kunz, J.
    Ruiz, M. Fernandez
    Muttoni, A.
    [J]. TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 152 - 152
  • [2] Concrete screws as a post-installed punching shear reinforcement
    Walkner, Rupert
    Spiegl, Matthias
    Feix, Juergen
    [J]. STRUCTURAL CONCRETE, 2021, 22 (02) : 709 - 725
  • [3] Behavior of Post-Installed Bonded Bars as Shear Reinforcement
    Fiset, Mathieu
    Villemure, Felix-Antoine
    Bastien, Josee
    Mitchell, Denis
    [J]. ACI STRUCTURAL JOURNAL, 2020, 117 (04) : 159 - 168
  • [4] Undercut and Grouted Anchors as Post-Installed Shear Reinforcement
    Dondrea, Anthony
    Bayrak, Oguzhan
    [J]. ACI STRUCTURAL JOURNAL, 2019, 116 (03) : 27 - 37
  • [5] Bending Shear Tests on R/C-Beams with Post-Installed Shear Reinforcement
    Randl, Norbert
    Kunz, Jakob
    [J]. BETON- UND STAHLBETONBAU, 2009, 104 (11) : 728 - 736
  • [6] Strengthening of Flat Slabs Against Punching Shear Using Post-Installed Shear Reinforcement
    Ruiz, Miguel Fernandez
    Muttoni, Aurelio
    Kunz, Jakob
    [J]. ACI STRUCTURAL JOURNAL, 2010, 107 (04) : 434 - 442
  • [8] Post-installed punching shear reinforcement for strengthening of flat-slabs
    Muttoni, A.
    Ruiz, M. Fernandez
    Kunz, J.
    [J]. BAUINGENIEUR, 2008, 83 : 503 - 511
  • [9] Shear strength of post-installed diagonal anchor
    [J]. 1600, Architectural Institute of Japan (78):
  • [10] Shear strength of reinforced concrete planar members with post-installed plate-anchored shear reinforcement
    Watanabe, Hideyoshi
    Ono, Hideo
    [J]. AIJ Journal of Technology and Design, 2020, 26 (64) : 952 - 956