A Novel Three-Stage Collision-Risk Pre-Warning Model for Construction Vehicles and Workers

被引:0
|
作者
Gan, Wenxia [1 ]
Gu, Kedi [1 ]
Geng, Jing [2 ]
Qiu, Canzhi [1 ,3 ]
Yang, Ruqin [4 ]
Wang, Huini [1 ]
Hu, Xiaodi [1 ]
机构
[1] Wuhan Inst Technol, Sch Civil Engn & Architecture, Wuhan 430074, Peoples R China
[2] Beijing Inst Technol, Sch Comp Sci & Technol, Beijing 100081, Peoples R China
[3] Guangdong Technol Coll, Inst Intelligent Mfg, Zhaoqing 526000, Peoples R China
[4] Hubei Inst Surveying & Mapping, Wuhan 430074, Peoples R China
基金
中国国家自然科学基金;
关键词
construction safety; collision prediction; computer vision; object tracking; trajectory prediction; collision-risk factors; STRUCK-BY; SAFETY; TRACKING; VISION;
D O I
10.3390/buildings14082324
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Collision accidents involving construction vehicles and workers frequently occur at construction sites. Computer vision (CV) technology presents an efficient solution for collision-risk pre-warning. However, CV-based methods are still relatively rare and need an enhancement of their performance. Therefore, a novel three-stage collision-risk pre-warning model for construction vehicles and workers is proposed in this paper. This model consists of an object-sensing module (OSM), a trajectory prediction module (TPM), and a collision-risk assessment module (CRAM). In the OSM, the YOLOv5 algorithm is applied to identify and locate construction vehicles and workers; meanwhile, the DeepSORT algorithm is applied to the real-time tracking of the construction vehicles and workers. As a result, the historical trajectories of vehicles and workers are sensed. The original coordinates of the data are transformed to common real-world coordinate systems for convenient subsequent data acquisition, comparison, and analysis. Subsequently, the data are provided to a second stage (TPM). In the TPM, the optimized transformer algorithm is used for a real-time trajectory prediction of the construction vehicles and workers. In this paper, we enhance the reliability of the general object detection and trajectory prediction methods in the construction environments. With the assistance afforded by the optimization of the model's hyperparameters, the prediction horizon is extended, and this gives the workers more time to take preventive measures. Finally, the prediction module indicates the possible trajectories of the vehicles and workers in the future and provides these trajectories to the CRAM. In the CRAM, the worker's collision-risk level is assessed by a multi-factor-based collision-risk assessment rule, which is innovatively proposed in the present work. The multi-factor-based assessment rule is quantitatively involved in three critical risk factors, i.e., velocity, hazardous zones, and proximity. Experiments are performed within two different construction site scenarios to evaluate the effectiveness of the collision-risk pre-warning model. The research results show that the proposed collision pre-warning model can accurately predict the collision-risk level of workers at construction sites, with good tracking and predicting effect and an efficient collision-risk pre-warning strategy. Compared to the classical models, such as social-GAN and social-LSTM, the transformer-based trajectory prediction model demonstrates a superior accuracy, with an average displacement error of 0.53 m on the construction sites. Additionally, the optimized transformer model is capable of predicting six additional time steps, which equates to approximately 1.8 s. The collision pre-warning model proposed in this paper can help improve the safety of construction vehicles and workers.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Collision Risk Warning Model for Construction Vehicles Based on YOLO and DeepSORT Algorithms
    Zhang, Fan
    Liu, Hongbo
    Chen, Zhihua
    Wang, Longxuan
    Zhang, Qian
    Guo, Liulu
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (06)
  • [2] The suitability analysis of company financial risk pre-warning model
    Li, Yan
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 5, 2010, : 17 - 20
  • [3] Pre-warning System Analysis on Dynamic Risk of Ship Collision with Bridge at Restricted Waters
    Huang, C.
    Hu, S.
    Kong, F.
    Xi, Y.
    2017 4TH INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS), 2017, : 698 - 703
  • [4] A Three-Stage Dynamic Risk Model for Metro Shield Tunnel Construction
    Na Xu
    Chaoran Guo
    Li Wang
    Xueqing Zhou
    Ying Xie
    KSCE Journal of Civil Engineering, 2024, 28 : 503 - 516
  • [5] A Three-Stage Dynamic Risk Model for Metro Shield Tunnel Construction
    Xu, Na
    Guo, Chaoran
    Wang, Li
    Zhou, Xueqing
    Xie, Ying
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (02) : 503 - 516
  • [6] Construction and management research of pre-warning system model about intellectual property
    Yang Chaobo
    Qi Ming
    ISMOT'07: Proceedings of the Fifth International Symposium on Management of Technology, Vols 1 and 2: MANAGING TOTAL INNOVATION AND OPEN INNOVATION IN THE 21ST CENTURY, 2007, : 1393 - 1397
  • [7] Risk pre-warning of tender evaluation for civil projects:an outlier detection model
    Cheng Tiexin1 Qi Xin1 Guo Tao2(1 College of Management
    Journal of Southeast University(English Edition), 2008, (S1) : 155 - 159
  • [8] Risk pre-warning of tender evaluation for civil projects:an outlier detection model
    Cheng Tiexin Qi Xin Guo Tao College of Management Tianjin Polytechnic University Tianjin China College of Industrial and Commercial Administration Tianjin Polytechnic University Tianjin China
    Journal of Southeast University(English Edition), 2008, (English Edition) : 155 - 159
  • [9] A three-stage model summarizes product warning and environmental sign research
    Laughery, Kenneth R.
    Wogalter, Michael S.
    SAFETY SCIENCE, 2014, 61 : 3 - 10
  • [10] Financial Risk Assessment and Pre-warning of Port Enterprises Based on Neural Network Model
    Zhao, Shuang
    JOURNAL OF COASTAL RESEARCH, 2020, : 243 - 246