Fatigue Integration to the Flowshop Scheduling Problem

被引:0
|
作者
Paredes-Astudillo, Yenny A. [1 ,2 ]
Jimenez, Jose-Fernando [3 ]
Montoya-Torres, Jairo R. [2 ]
Botta-Genoulaz, Valerie [1 ]
机构
[1] Univ Claude Bernard Lyon 1, Univ Lyon 2, Univ Lyon, Disp UR4570,INSA Lyon, F-69621 Villeurbanne, France
[2] Univ La Sabana, Sch Engn, Km 7 Autopista Norte De Bogota DC, Chia, Colombia
[3] Univ Savoie Mt Blanc, SYMME Lab, Annecy, France
关键词
Flowshop; fatigue effect; picking line; multi-agent model; breaks; DISCRETE-EVENT SIMULATION; MODEL; ASSIGNMENT; RECOVERY; MACHINE; SYSTEMS; TASKS;
D O I
10.1007/978-3-031-53445-4_12
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Although automation has increased, hand-intensive production systems persist because workers are required to be extremely flexible and precise in completing some tasks. As a result of their impact on manual task productivity, learning and fatigue effects generate interest. This article discusses a flowshop scheduling problem (FSSP) involving physical fatigue. This configuration is commonly used in hand-intensive production systems. A multi-agent model is proposed to validate the integration of physical fatigue into the FSSP. The case study described in this paper is based on a manual picking line with one worker per station. In order to recover efficiently, the location and duration of breaks are crucial. Two break policies are evaluated in this article to identify their impact on human and system performance. As an exploratory approach, this research used benchmark datasets to conduct validation experiments. Our contribution is to develop a model that incorporates fatigue into a flowshop type production system, and define the policy of breaks to minimize the human fatigue dose.
引用
收藏
页码:135 / 147
页数:13
相关论文
共 50 条
  • [1] The tricriteria flowshop scheduling problem
    Eren, Tamer
    Guner, Ertan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (11-12): : 1210 - 1220
  • [2] On the hybrid flowshop scheduling problem
    Haouari, Mohamed
    Hidri, Lotfi
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (01) : 495 - 497
  • [3] The tricriteria flowshop scheduling problem
    Tamer Eren
    Ertan Güner
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 36 : 1210 - 1220
  • [4] ALTERNATIVE FORMULATIONS OF A FLOWSHOP SCHEDULING PROBLEM
    WILSON, JM
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (04) : 395 - 399
  • [5] HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING PROBLEM
    GUPTA, JND
    [J]. REVUE FRANCAISE D AUTOMATIQUE INFORMATIQUE RECHERCHE OPERATIONNELLE, 1976, 10 (06): : 63 - 73
  • [6] Optimization Technique for Flowshop Scheduling Problem
    Jukuntla, Amar
    [J]. ARTIFICIAL INTELLIGENCE AND EVOLUTIONARY COMPUTATIONS IN ENGINEERING SYSTEMS, ICAIECES 2017, 2018, 668 : 187 - 193
  • [7] A Genetic Algorithm for the Flowshop Scheduling Problem
    Qi Yuesheng
    Wang Baozhong
    Kang Lishan(State Key Laboratory of Software Engineering
    [J]. Wuhan University Journal of Natural Sciences, 1998, (04) : 410 - 412
  • [8] Combinatorial particleswarmoptimizationforsolvingblocking flowshop scheduling problem
    Eddaly, Mansour
    Jarboui, Bassem
    Siarry, Patrick
    [J]. JOURNAL OF COMPUTATIONAL DESIGN AND ENGINEERING, 2016, 3 (04) : 295 - 311
  • [9] The distributed permutation flowshop scheduling problem
    Naderi, B.
    Ruiz, Ruben
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (04) : 754 - 768
  • [10] A Heuristic Algorithm for Flowshop Scheduling Problem
    Tang, Dan
    Shu, Hong Ping
    [J]. MANUFACTURING ENGINEERING AND AUTOMATION II, PTS 1-3, 2012, 591-593 : 626 - 630