Bridging the gap: Linking prototyping and technology readiness levels for integrative product development

被引:0
|
作者
Rehberg, Laura [1 ]
Brem, Alexander [1 ,2 ]
机构
[1] Univ Stuttgart, Inst Entrepreneurship & Innovat Sci ENI, D-70569 Stuttgart, Germany
[2] Univ Southern Denmark, Dept Technol & Innovat, Als 2, DK-6400 Sonderborg, Denmark
关键词
new product development; maturity; product development; prototype; prototyping; TRL; OPPORTUNITIES; CHALLENGES; SOFTWARE; SYSTEMS;
D O I
10.1111/caim.12633
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Shorter development cycles, increasing complexity due to the interaction of hardware and software and the simultaneous pressure to innovate and reduce costs lead to products being launched early that have not yet been sufficiently validated and tested. The prototyping phase is crucial to ensure maturity as a preliminary stage to series production. Although this validation is critical to ensure the maturity of the product or technology to avoid recalls, previous research has focused on exploring the phenomenon of prototyping in general. To fill this gap, we use the standardized framework of technology readiness levels and develop prototyping readiness levels that allow for a graded assessment of maturity.Our empirical study is based on the unique case of the Boeing 737 Max 8 and a research project to develop an automated prototyping hub. Our findings show how mismanagement of prototypes and inadequate technology readiness level (TRL) assessment can lead to serious safety issues. Based on these findings, we introduce prototyping readiness levels that complement the idea of TRLs to reduce and eliminate bottlenecks and errors in the early stages of the development process.
引用
收藏
页码:237 / 252
页数:16
相关论文
共 34 条
  • [1] TecHUB 4.0-Technology and Entrepreneurship Education for Bridging the Gap in Smart Product Development
    Ulmeanu, Mihaela
    Doicin, Cristian
    Rosca, Liviu
    Rennie, Allan
    Abram, Tom
    Bajdor, Paula
    9TH INTERNATIONAL CONFERENCE ON MANUFACTURING SCIENCE AND EDUCATION (MSE 2019): TRENDS IN NEW INDUSTRIAL REVOLUTION, 2019, 290
  • [2] Linking Strategy and Roadmap: Integrative Design of Technology, Product and Production
    Schuh, G.
    Hacker, P. A.
    Schubert, J.
    Wellensiek, M.
    Kitzer, P.
    Meinecke, M.
    Schaller, C.
    Weber, P.
    Zeppenfeld, C.
    PICMET '12: PROCEEDINGS - TECHNOLOGY MANAGEMENT FOR EMERGING TECHNOLOGIES, 2012, : 147 - 157
  • [3] NEW PRODUCT DEVELOPMENT USING THE TECHNOLOGY FOR RAPID PROTOTYPING
    Simunic, Nikola
    Gros, Josip
    Medic, Srdan
    TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2013, 7 (02): : 187 - 190
  • [4] A METHODOLOGY FOR EVALUATING TECHNOLOGY READINESS DURING PRODUCT DEVELOPMENT
    Hicks, Ben
    Larsson, Andreas
    Culley, Steve
    Larsson, Tobias
    ICED 09 - THE 17TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, VOL 3: DESIGN ORGANIZATION AND MANAGEMENT, 2009, : 157 - +
  • [5] Rapid prototyping technology: applications and benefits for rapid product development
    S. O. Onuh
    Y. Y. Yusuf
    Journal of Intelligent Manufacturing, 1999, 10 : 301 - 311
  • [6] Rapid prototyping technology: applications and benefits for rapid product development
    Onuh, SO
    Yusuf, YY
    JOURNAL OF INTELLIGENT MANUFACTURING, 1999, 10 (3-4) : 301 - 311
  • [7] The development of integrative biology: bridging the gap-a view from the Scientific Editors
    Beebe, David J.
    Barcellos-Hoff, Mary Helen
    INTEGRATIVE BIOLOGY, 2009, 1 (02) : 145 - 147
  • [8] Bridging the Technology Gap: Building a Development Model for Rural Alaska
    Dinero, Steven
    Mariotz, Elizabeth
    Bhagat, Parimal
    JOURNAL OF CULTURAL GEOGRAPHY, 2007, 24 (02) : 53 - 77
  • [9] Technology readiness levels for advanced nuclear fuels and materials development
    Carmack, W. J.
    Braase, L. A.
    Wigeland, R. A.
    Todosow, M.
    NUCLEAR ENGINEERING AND DESIGN, 2017, 313 : 177 - 184
  • [10] Bridging the gap between technology development and market implementation for vehicle safety
    Minarini, F
    ADVANCED MICROSYSTEMS FOR AUTOMOTIVE APPLICATIONS 2004, 2004, : 3 - 8