River Bank Erosion Prediction Using Multivariable Linear Regression

被引:0
|
作者
Do, Hao Duc [1 ]
机构
[1] FPT Univ, Ho Chi Minh City, Vietnam
来源
关键词
riverbank erosion prediction; multivariable linear regression; machine learning; RATES;
D O I
10.6180/jase.202412_27(12).0006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research proposes a new approach using multivariable linear regression to predict the riverbank erosion speed. As a simple and interpretable model, the proposed approach gains two main achievements. First, it can specify the main factors causing riverbank erosion. Notably, the method identifies the river's depth and the water flow's hydraulic gradient, contributing primarily to the erosion speed. Second, multivariable linear regression can be learned from such a small dataset. This aspect makes the range of applications for the method much broader. The Experimental results show that the multivariable linear regression can predict erosion speed well. With a dataset with only 27 records, the method can predict the erosion speed with an error of around 2 meters per year. In the future, a more extensive training dataset or a more complicated regression model is requested to gain a better result.
引用
收藏
页码:3663 / 3668
页数:6
相关论文
共 50 条
  • [1] PREDICTION OF DRILL-BIT PERFORMANCE USING MULTIVARIABLE LINEAR-REGRESSION ANALYSIS
    ERSOY, A
    WALLER, MD
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1995, 104 : A101 - A114
  • [2] Modified Multivariable Linear Regression Model for Prediction of System Parameters
    Shinde, Amol
    Angal, Yogesh S.
    Pal, Krishan
    PROCEEDINGS OF THE 2018 3RD INTERNATIONAL CONFERENCE ON INVENTIVE COMPUTATION TECHNOLOGIES (ICICT 2018), 2018, : 88 - 91
  • [3] Prediction of river bank erosion and protection works in a reach of Chenab River, Pakistan
    Muhammad Ashraf
    Abdul Sattar Shakir
    Arabian Journal of Geosciences, 2018, 11
  • [4] Prediction of river bank erosion and protection works in a reach of Chenab River, Pakistan
    Ashraf, Muhammad
    Shakir, Abdul Sattar
    ARABIAN JOURNAL OF GEOSCIENCES, 2018, 11 (07)
  • [5] Prediction of occupational risk in the shipbuilding industry using multivariable linear regression and genetic algorithm analysis
    Tsoukalas, V. D.
    Fragiadakis, N. G.
    SAFETY SCIENCE, 2016, 83 : 12 - 22
  • [6] Prediction of Bank Erosion in a Reach of the Sacramento River and its Mitigation with Groynes
    Ercan, A.
    Younis, B. A.
    WATER RESOURCES MANAGEMENT, 2009, 23 (15) : 3121 - 3147
  • [7] Prediction of Bank Erosion in a Reach of the Sacramento River and its Mitigation with Groynes
    A. Ercan
    B. A. Younis
    Water Resources Management, 2009, 23 : 3121 - 3147
  • [8] Predicting Total Sugar Production Using Multivariable Linear Regression
    Gupta, Santosh Kr
    Agarwal, Arun Prakash
    2021 IEEE INTERNATIONAL CONFERENCE ON COMPUTING, COMMUNICATION, AND INTELLIGENT SYSTEMS (ICCCIS), 2021, : 465 - 469
  • [9] Effect of grid spacing on the prediction of bank erosion in a large braided alluvial river
    Mamun, M
    Islam, M
    Proceedings of the Fifteenth IASTED International Conference on Modelling and Simulation, 2004, : 174 - 179
  • [10] Prediction and early-warning of bank erosion in the Middle Yangtze River, China
    Deng, Shanshan
    Xia, Junqiang
    Zhou, Yueyao
    Zhou, Meirong
    Zhu, Heng
    CATENA, 2024, 242