Optimal maintenance policy design considering learning effects under successive performance-based contracts ☆

被引:0
|
作者
Dai, Anshu [1 ]
Luo, Zhi [3 ]
Zhao, Xiujie [2 ]
Qin, Juanjuan [3 ]
Ruan, Yuanpeng [4 ]
机构
[1] Tianjin Univ Finance & Econ, Sch Management Sci & Engn, Tianjin 300222, Peoples R China
[2] Tianjin Univ, Coll Management & Econ, Tianjin 300072, Peoples R China
[3] Tianjin Univ Finance & Econ, Sch Business, Tianjin 300222, Peoples R China
[4] Hangzhou Dianzi Univ, Sch Management, Hangzhou 310018, Peoples R China
基金
中国国家自然科学基金;
关键词
Successive short-term performance-based; contracts; Learning effects; Condition-based maintenance; Wiener process; PREVENTIVE MAINTENANCE; PRODUCTS; OPTIMIZATION; RELIABILITY; DEGRADATION;
D O I
10.1016/j.cie.2024.110287
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Successive short-term performance-based contracts (PBCs) would not only drive the original equipment manufacturer (OEM) to improve maintenance service quality, but also decrease the financial burdens of the equipment owner. This paper presents the optimal maintenance policy incorporating both preventive maintenance (PM) and upgrade actions for continuously monitored degrading equipment under successive short-term PBCs. The improvement factor model is adopted to characterize the impact of the PM and upgrade actions. We also consider that the OEM's learning effects will affect the cost and duration of the PM, as well as the upgrade cost. The learning effect increases as the period of the contract accumulates. To characterize the varied equipment production and degradation rates across different PBC periods, a Wiener process with covariates is developed. Meanwhile, we assume that the reward and penalty parameters of the performancebased revenue function varied each contract period, thus motivating the OEM to enhance the equipment availability. Based on that, the optimal maintenance plan for each contract period is determined to maximize the OEM's expected net profit. Numerical examples show the superiority and examine the sensitivity of the proposed successive short-term PBCs. Managerial insights are also given to guide the implementation of the proposed maintenance policy.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts
    Qiu, Qingan
    Cui, Lirong
    Shen, Jingyuan
    Yang, Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 147 - 155
  • [2] Optimal Maintenance and Rehabilitation Policies for Performance-Based Road Maintenance Contracts
    Abu Samra, Soliman
    Osman, Hesham
    Hosny, Ossama
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (01)
  • [3] Technology investment effects in performance-based maintenance contracts
    Ulloa, R. S.
    Mac Cawley, A. F.
    Santelices, G. A.
    Pascual, R.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (07) : 2628 - 2645
  • [4] Research on Equipment Maintenance Pricing Model under Performance-based Contracts
    Zhang, Chengyi
    Lin, Mingchi
    [J]. CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 629 - 635
  • [5] Development of Maintenance and Rehabilitation Program Pavement Assets Under Performance-Based Contracts
    Alyami, Zaid
    Tighe, Susan L.
    [J]. TRANSPORTATION RESEARCH RECORD, 2013, (2361) : 1 - 10
  • [6] Framework Development of Performance-Based Striping Maintenance Contracts
    Shrestha, Kishor
    Shrestha, Pramen P.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (02)
  • [7] Embracing complexity in performance-based contracts for road maintenance
    Schoenmaker, Rob
    de Bruijn, Hans
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2016, 65 (01) : 4 - 24
  • [8] Optimal preventive maintenance strategy for leased equipment under successive usage-based contracts
    Wang, Xiaolin
    Li, Lishuai
    Xie, Min
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (18) : 5705 - 5724
  • [9] Optimal two-stage abort policy considering performance-based missions
    Chen, Jianhui
    Gao, Hongda
    Fang, Chen
    [J]. Reliability Engineering and System Safety, 2025, 257
  • [10] Quantifying the Effectiveness of Performance-Based Pavement Marking Maintenance Contracts
    Geedipally, Srinivas Reddy
    Songchitruksa, Praprut
    Pike, Adam M.
    [J]. TRANSPORTATION RESEARCH RECORD, 2015, (2482) : 23 - 31