共 50 条
- [4] Research on Equipment Maintenance Pricing Model under Performance-based Contracts [J]. CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 629 - 635
- [9] Optimal two-stage abort policy considering performance-based missions [J]. Reliability Engineering and System Safety, 2025, 257