共 50 条
- [1] Construction monitoring of prestressed concrete continuous beam bridge [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 308 - 312
- [2] Influence Of Temporary Fixation To Deflection Control In Construction Of Multi-span Continuous Beam Bridge [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION (ICMS2009), VOL 4, 2009, : 219 - 224
- [4] Dynamic Analysis of Prestressed Concrete Multi-span Continuous Urban Viaduct Beam Bridge under Moving Highway Vehicle Load [J]. ADVANCES IN ENVIRONMENTAL VIBRATION, 2011, : 485 - 493
- [5] Result and implications of the damage index method applied to a multi-span continuous segmental prestressed concrete bridge [J]. PROCEEDINGS OF US-KOREA WORKSHOP ON NEW FRONTIER IN INFRASTRUCTURAL/SEISMIC ENGINEERING, 2000, : 287 - 303
- [7] Long span prestressed concrete continuous rigid-frame bridge ANN construction control [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2261 - 2264
- [8] Optimization on Closure Scheme of Multi-Span Prestressed Concrete Box-Girder Bridge [J]. ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2369 - 2375
- [10] New approach to multi-span CFRP continuous prestressed bridges [J]. FRP COMPOSITES IN CIVIL ENGINEERING, VOLS I AND II, PROCEEDINGS, 2001, : 1177 - 1184