Earliness-Tardiness Scheduling with Delivery Times and Deteriorating Jobs

被引:3
|
作者
Lu, Yuan-Yuan [1 ]
Zhang, Shuang [1 ]
Tao, Jia-Yi [1 ]
机构
[1] Jilin Normal Univ, Coll Math & Comp, Siping 136000, Peoples R China
关键词
Scheduling; deterioration effects; due-window assignment; delivery times; single-machine; DUE-WINDOW ASSIGNMENT; SINGLE-MACHINE; GROUP-TECHNOLOGY; RESOURCE; COMMON;
D O I
10.1142/S021759592450009X
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses single-machine scheduling problems with past-sequence-dependent (denoted by psd) delivery times, due-window assignments and deteriorating jobs simultaneously. The psd delivery time of a job is proportional to the job's waiting time, and the deteriorating jobs mean that the processing time of a job is a proportional increasing function of its starting time. For common, slack and different due-window assignments, the goal is to minimize the weighted sum of earliness, tardiness, due-window starting time and size. Some optimal propositions of the problems are given, and by these propositions, polynomial time algorithms are proposed to optimally solve the above problems.
引用
收藏
页数:17
相关论文
共 50 条