An efficient method for modeling and evaluating the bench terrain of open-pit mines

被引:0
|
作者
Wang, Bonan [1 ,2 ]
Gong, Bing [2 ]
Xu, Wei [2 ]
Shi, Xiaoshan [3 ]
机构
[1] Northeastern Univ, Coll Resources & Civil Engn, Shenyang, Peoples R China
[2] Beijing Gen Res Inst Min & Met, Beijing, Peoples R China
[3] Chinese Inst Coal Sci, Acad Deep Earth Sci, Beijing, Peoples R China
关键词
open-pit mine; bench floor; terrain; interpolation algorithm; digital elevation model; DIGITAL ELEVATION MODELS; INTERPOLATION METHODS; SAMPLING DENSITY; LIDAR; VARIABILITY; RESOLUTION;
D O I
10.3389/feart.2024.1351352
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
In order to quantitatively analyze the roughness of the bench floor during open-pit mine blasting, this study proposes a real-time measuring method for the three-dimensional terrain of the bench floor during the excavation process. Real-time monitoring is conducted at the boundary and discrete internal points of the workbench floor during electric shovel operation, utilizing real-time kinematic global navigation satellite system (RTK-GNSS) positioning technology. An improved convex hull algorithm is introduced to automatically extract the optimal boundary of discrete point clouds based on their spatial distribution characteristics. This study establishes a digital elevation model (DEM) using five interpolation algorithms for 3D terrain visualization simulation. Through cross-validation, a comparative analysis of the DEM accuracy, the simulation results of the ordinary kriging interpolation algorithm were found to be optimized. The optimized interpolation algorithm is applied to simulate the 3D terrain in the Dexing open-pit copper mine, and the relevant terrain parameters were calculated. This dataset can serve as a precise foundation for the real-time path planning of elevation blasting design and ground leveling operations.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] The titans of open-pit mines
    不详
    [J]. ZKG INTERNATIONAL, 2014, 67 (10): : 20 - 20
  • [2] Inter-ramp and bench design of open-pit mines: the Portage pit case study
    Grenon, Martin
    Laflamme, Amelie-Julie
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 2011, 48 (11) : 1601 - 1615
  • [3] EFFICIENT USING OF AUTOMOBILE TRANSPORT FOR THE DEEP OPEN-PIT MINES
    Mahambetov, Dastan
    Rakishev, Bayan
    Samenov, Galymzhan
    Sladkowski, Aleksander
    [J]. TRANSPORT PROBLEMS, 2013, 8 (03) : 25 - 32
  • [4] Open-Pit Map: An HD Map Data Model for Open-Pit Mines
    Xu, Xingliang
    Wang, Zhuo
    Huang, Pengli
    Tian, Suchuan
    Bi, Lin
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (23):
  • [5] Breeze Circulation in Open-Pit Mines
    [J]. J Min Sci, (216):
  • [6] BREEZE CIRCULATION IN OPEN-PIT MINES
    BELOUSOV, VI
    [J]. JOURNAL OF MINING SCIENCE, 1995, 31 (03) : 216 - 220
  • [7] OPTIMUM DESIGN OF OPEN-PIT MINES
    LERCHS, H
    GROSSMAN.FI
    [J]. OPERATIONS RESEARCH, 1964, 12 : B59 - &
  • [8] Material properties of tailings of open-pit mines using coupled modeling
    Procházka, P
    Trcková, J
    [J]. DEVELOPMENT AND APPLICATION OF COMPUTER TECHNIQUES TO ENVIRONMENTAL STUDIES, 2002, 9 : 361 - 370
  • [9] OPEN-PIT DEWATERING AT PINE POINT MINES
    CALVER, B
    FARNSWOR.DJ
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (692): : 1290 - &
  • [10] CHANGING MANAGEMENT METHODS IN OPEN-PIT MINES
    YOUNG, PV
    [J]. CIM BULLETIN, 1985, 78 (879): : 46 - 48