On-site handling: Automated connecting device for modular construction used as lifting apparatus

被引:0
|
作者
Picard, Laurence [1 ,2 ]
Blanchet, Pierre [2 ]
Begin-Drolet, Andre [1 ]
机构
[1] Laval Univ, Dept Mech Engn, Quebec City, PQ G1V 0A6, Canada
[2] Univ Laval, NSERC Ind Chair Ecoresponsible Wood Construction C, Dept Wood & Forest Sci, Quebec City, PQ G1V 0A6, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Self-locking connecting device for off-site construction; Module lifting during on-site assembly; Novel device for connecting and lifting; modules; BIM integration of module connections;
D O I
10.1016/j.istruc.2024.106318
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Modular construction is an alternative method to traditional construction that differs mainly by its discretization of structural elements in modular forms and by three specific steps in its process: off-site manufacturing, transportation and on-site assembly (modular lifting and connection). The assembly process of modular buildings can highly benefit from inter-modular connections that comprise robust and functional features to guarantee a safe and efficient modular assembly procedure. Inter-modular connections are critical to the structural stability of the structure, and research has been conducted in recent years to tackle the challenges associated with modular assembly. Automated connecting devices have been identified as the inter-connections having the best potential to resolve both structural and functional requirements. Moreover, the assembly process itself must also take place in accordance with a safe and efficient lifting procedure that limits deformation of the lifted module so as not to affect its structural integrity nor damage aesthetical elements of the modules. This paper thus explores the possibility of combining the functions of modular assembly and modular lifting in a single device comprising a self-locking mechanism, namely an automated connecting and lifting device. Both functional and structural performances of this design were assess in a full scale experimental off-site project which demonstrate the advantages and disadvantages of combining lifting and connecting features within a single device in light-framed wood modular buildings.
引用
收藏
页数:12
相关论文
共 24 条
  • [1] On-site handling: Automated connecting device for modular construction used as lifting apparatus
    Picard, Laurence
    Blanchet, Pierre
    Bégin-Drolet, André
    [J]. Structures, 2024, 63
  • [2] Full-Scale Implementation of an Automated Connecting Device for Modular Construction
    Picard, Laurence
    Blanchet, Pierre
    Begin-Drolet, Andre
    [J]. BUILDINGS, 2024, 14 (02)
  • [3] Automated planning support for on-site construction inspection
    Gordon, Chris
    Akinci, Burcu
    Garrett, James H., Jr.
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 17 (06) : 705 - 718
  • [4] Evolution of the crane selection and on-site utilization process for modular construction multilifts
    Olearczyk, Jacek
    Al-Hussein, Mohamed
    Bouferguene, Ahmed
    [J]. AUTOMATION IN CONSTRUCTION, 2014, 43 : 59 - 72
  • [5] Digital Construction Automated design and construction experiments using customised on-site digital devices
    van Ameijde, Jeroen
    Carlin, Brendon
    [J]. ECAADE 2012, VOL 2: PHYSICAL DIGITALITY, 2013, : 439 - 446
  • [6] Analyzing Some Aspects of Robot-oriented Design Approach at Material Handling and Manipulation Systems of On-site Automated Construction Technologies
    Vidovszky, István
    [J]. Periodica Polytechnica Mechanical Engineering, 2024, 68 (04): : 352 - 360
  • [7] Multi-objective optimization for coordinated production and transportation in prefabricated construction with on-site lifting requirements
    Yin, Jing
    Huang, Ran
    Sun, Hao
    Cai, Shunyao
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 189
  • [8] Assembly Solution for Modular Buildings: Development of an Automated Connecting Device for Light-Framed Structures
    Picard, Laurence
    Blanchet, Pierre
    Begin-Drolet, Andre
    [J]. BUILDINGS, 2022, 12 (05)
  • [9] Automated construction: boosting on-site productivity using a platform-based approach
    Masters, Kevin
    Johnston, Jaimie
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (06) : 23 - 28
  • [10] Digital twin-enabled smart modular integrated construction system for on-site assembly
    Jiang, Yishuo
    Li, Ming
    Guo, Daqiang
    Wu, Wei
    Zhong, Ray Y.
    Huang, George Q.
    [J]. COMPUTERS IN INDUSTRY, 2022, 136