Energy-Conscious Common Operation Scheduling in an Identical Parallel Machine Environment

被引:0
|
作者
Ataei, H. [1 ]
Ahmadizar, F. [1 ]
Arkat, J. [1 ]
机构
[1] Univ Kurdistan, Dept Ind Engn, Sanandaj, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2024年 / 37卷 / 07期
关键词
Bi-objective Mixed Integer Linear Programming; Identical Parallel Machine Scheduling Common Operation; Total Energy Consumption; Total Completion Time; CUTTING STOCK PROBLEM; ALGORITHM; MINIMIZE; CONSUMPTION; TYPOLOGY;
D O I
10.5829/ije.2024.37.07a.20
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The relentless growth of global energy consumption poses a multitude of complex challenges, including the depletion of finite energy resources and the exacerbation of greenhouse gas emissions, which contribute to climate change. In the face of these pressing environmental concerns, the manufacturing sector, a significant energy consumer, is under immense pressure to adopt sustainable practices. The critical intersection of energy consumption management and production operation scheduling emerges as a pivotal domain for addressing these challenges. The scheduling of common operations, exemplified by the cutting stock problem in industries like furniture and apparel, represents a prevalent challenge in production environments. For the first time, this paper pioneers an investigation into an identical parallel machine scheduling problem, taking into account common operations to minimize total energy consumption and total completion time concurrently. For this purpose, two bi-objective mixed integer linear programming models are presented, and an augmented epsilon - constraint method is used to obtain the Pareto optimal front for small-scale instances. Considering the NP -hardness of this problem, a nondominated sorting genetic algorithm (NSGA-II) and a hybrid non -dominated sorting genetic algorithm with particle swarm optimization (HNSGAII-PSO) are developed to solve medium- and large-scale instances to achieve good approximate Pareto fronts. The performance of the proposed algorithms is assessed by conducting computational experiments on test problems. The results demonstrate that the proposed HNSGAII-PSO performs better than the suggested NSGA-II in solving the test problems.
引用
收藏
页码:1443 / 1465
页数:23
相关论文
共 50 条
  • [1] Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs
    Che, Ada
    Zhang, Shibohua
    Wu, Xueqi
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 156 : 688 - 697
  • [2] Energy-conscious Resource Scheduling in Cloud Computing Environment: A Pragmatic View
    Singh, Harvinder
    Tyagi, Sanjay
    Kumar, Pardeep
    [J]. PROCEEDINGS ON 2016 2ND INTERNATIONAL CONFERENCE ON NEXT GENERATION COMPUTING TECHNOLOGIES (NGCT), 2016, : 644 - 649
  • [3] Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines
    Meng, Leilei
    Zhang, Chaoyong
    Shao, Xinyu
    Ren, Yaping
    Ren, Caile
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (04) : 1119 - 1145
  • [4] Scheduling energy-conscious tasks in distributed heterogeneous computing systems
    Liu, Yifan
    Du, Chenglie
    Chen, Jinchao
    Du, Xiaoyan
    [J]. CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2022, 34 (01):
  • [5] Energy-efficient scheduling in an identical parallel machine environment with peak power consumption and deadline constraints
    Li, XiYing
    Liu, ChenGuang
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2024, 170
  • [6] Energy-Conscious Parts Routing for Machine-Shop Configuration
    Iqbal, Asif
    Cheok, Quentin
    Nauman, Malik M.
    [J]. 2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 159 - 163
  • [7] PUBLIC UTILITY RATE MAKING IN AN ENERGY-CONSCIOUS ENVIRONMENT - SICHEL,W
    LEVIN, SL
    [J]. GROWTH AND CHANGE, 1980, 11 (03) : 55 - 56
  • [8] Parallel machine scheduling with a common server
    Hall, NG
    Potts, CN
    Sriskandarajah, C
    [J]. DISCRETE APPLIED MATHEMATICS, 2000, 102 (03) : 223 - 243
  • [9] EPTAS for parallel identical machine scheduling with time restrictions
    Jaykrishnan, G.
    Levin, Asaf
    [J]. JOURNAL OF COMBINATORIAL OPTIMIZATION, 2024, 47 (02)
  • [10] STOCHASTIC IDENTICAL PARALLEL MACHINE SCHEDULING WITH OR PRECEDENCE CONSTRAINTS
    FOULDS, LR
    HOFFMANN, D
    NEUMANN, K
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 1991, 8 (01) : 1 - 25