Influential factors for risk assessment and allocation on complex design-build infrastructure projects; the Texas experience

被引:0
|
作者
Demetracopoulou, Vassiliki [1 ,3 ]
O'Brien, William J. [1 ]
Khwaja, Nabeel [2 ]
机构
[1] Univ Texas Austin, Dept Civil Architectural & Environm Engn, Austin, TX 78712 USA
[2] Univ Texas Austin, Ctr Transportat Res, Austin, TX USA
[3] Rutgers State Univ, Dept Civil & Environm Engn, Piscataway, NJ USA
关键词
design-build; risk; risk allocation; transportation infrastructure; complex projects; transportation owners; HIGHWAY DESIGN;
D O I
10.3389/fbuil.2024.1330506
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Introduction: The design-build (DB) delivery method is used to deliver increasingly complex transportation infrastructure projects associated with higher uncertainty. As such, allocating risks in the contract between the owner and design-builder becomes challenging and often leads to higher initial bids, increased contingency, or claims. Learnings from implementation worldwide have underlined the need for improving risk allocation in DB contracts. Most existing studies address risk allocation mechanisms to manage contingency at the contract level. Other studies have recognized the need for owners to adapt their processes to better allocate risks in DB contracts. This study explored the influential factors for risk assessment and allocation for complex DB infrastructure projects, addressing the opportunity to improve transportation owners' risk allocation processes before the design-builder is selected and the DB contract is awarded.Method: The objectives of this work were achieved by utilizing empirical data collected through 20 interviews with Texas Department of Transportation and private sector experts. The interview data were analyzed using inductive and axial coding. Inductive coding allowed themes to emerge without a pre-existing framework, identifying six influential factors and six pertinent risks on complex DB projects.Results: These factors include the (i) Quality of DB teams, (ii) Level of up-front investigation, (iii) Limitations on the timing of letting, (iv) Design optimization opportunities, (v) Project-specific requirements, and (vi) Relationships with third parties. Through axial coding, the interaction and frequency between the factors and risks were also examined. The coded interactions demonstrated how the identified factors influence allocation for six pertinent risks including right-of-way acquisition, stakeholder approval, site conditions, permits and third-party agreements, railroad interaction, and utility adjustments and coordination. Findings indicate that the evaluation of these interactions can shift the risk allocation from baseline norms established by an agency to correspond to project-specific needs.Contribution: In contributing to the infrastructure project management, this is the first study to examine the factors that influence risk allocation in complex DB projects and examine interactions with pertinent risks, setting the foundation for optimizing allocation based on project-specific needs. In practice, the findings presented in this study can guide owners in adapting their allocation practices, managing, and developing their strategic plan for delivering complex DB projects. The findings can also assist contractors in pricing risks more efficiently and increase competitive bidding.
引用
收藏
页数:14
相关论文
共 34 条
  • [1] Risk allocation in design-build and BOT projects
    Nielsen, KR
    [J]. CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT, 1998, : 37 - 53
  • [2] Risk allocation for subsurface conditions: design-build projects
    Hatem, DJ
    [J]. NORTH AMERICAN TUNNELING 2000: UNDERGROUND CONSTRUCTION: THE REVOLUTION CONTINUES, 2000, : 97 - 123
  • [3] Management and Contract Allocation of Geotechnical Risks on Mega Design-Build Infrastructure Projects
    Dawoody, Hajer W.
    Gad, Ghada M.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 210 - 218
  • [4] Dynamic Management of Risk Contingency in Complex Design-Build Projects
    De Marco, Alberto
    Rafele, Carlo
    Thaheem, Muhammad Jamaluddin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
  • [5] Impact of Design Risk on the Performance of Design-Build Projects
    Liu, Junying
    Xie, Qunxia
    Xia, Bo
    Bridge, Adrian J.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (06)
  • [6] Appropriate risk allocation in design-build RFPs
    Molenaar, K
    Vanegas, JA
    Martinez, H
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 1083 - 1092
  • [7] Assessment of State Agencies' Practices in Managing Geotechnical Risk in Design-Build Projects
    Castro-Nova, Ivan
    Gad, Ghada M.
    Gransberg, Douglas D.
    [J]. TRANSPORTATION RESEARCH RECORD, 2017, (2630) : 9 - 14
  • [8] Utility assessment of electronic networking technologies for design-build projects
    Abduh, M
    Skibniewski, MJ
    [J]. AUTOMATION IN CONSTRUCTION, 2003, 12 (02) : 167 - 183
  • [9] Impact of Risk on Design-Build Selection for Highway Design and Construction Projects
    Tran, Dai Q.
    Molenaar, Keith R.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 153 - 162
  • [10] Managing Geotechnical Risk on US Design-Build Transport Projects
    McLain, Kevin
    Gransberg, Douglas
    Loulakis, Micheal
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (01): : 1 - 19