A Net Present Value Analysis of Opportunity-Based Age Replacement Models in Discrete Time

被引:0
|
作者
Wu, Jing [1 ]
Qian, Cunhua [2 ]
Dohi, Tadashi [1 ]
机构
[1] Hiroshima Univ, Grad Sch Adv Sci & Engn, 1-4-1 Kagamiyama, Higashihiroshima 7398527, Japan
[2] Nanjing Tech Univ, Sch Econ & Management, Nanjing 211816, Peoples R China
关键词
discrete time models; replacement first; replacement last; discounted cost functions; replacement priority; NPV method; probabilistic priority; POLICY; LAST;
D O I
10.3390/math12101472
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
Two important opportunistic age replacement models, under replacement first and last disciplines, are generalized in discrete time. The net present value (NPV) is applied to formulate the expected total costs. The priority of multiple replacement options is considered to classify the cost model with discounting into six cases. Since the NPV method accurately calculates the expected replacement costs over an infinite horizon in an unstable economic environment, we discuss some optimal opportunistic age replacement policies which minimize the expected total discounted costs over an infinite time horizon. Furthermore, we formulate a unified model under each discipline, merging six discrete time replacement models with probabilistic priority. Finally, a case study on optimal replacement first and last policies for pole air switches in a Japanese power company is presented.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] Optimal opportunity-based age replacement policies in discrete time
    Wu, Jing
    Qian, Cunhua
    Dohi, Tadashi
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 241
  • [2] An NPV analysis of opportunity-based age replacement model
    Wu, Jing
    Qian, Cunhua
    Dohi, Tadashi
    Okamura, Hiroyuki
    [J]. International Journal of Reliability and Safety, 2024, 18 (02) : 121 - 143
  • [3] Failure-Correlated Opportunity-based Age Replacement Models
    Dohi, Tadashi
    Okamura, Hiroyuki
    [J]. INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2020, 27 (02)
  • [4] Opportunity-based continuous and discrete replacement with age dependent minimal repair
    Satow, T
    Osaki, S
    [J]. 6TH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN, PROCEEDINGS, 2000, : 228 - 232
  • [5] Formulation of Opportunity-Based Age Replacement Models with Markovian Arrival Process
    Okamura, Hiroyuki
    Zheng, Junjun
    Dohi, Tadashi
    [J]. 2020 ASIA-PACIFIC INTERNATIONAL SYMPOSIUM ON ADVANCED RELIABILITY AND MAINTENANCE MODELING (APARM), 2020,
  • [6] An extended opportunity-based age replacement policy
    Iskandar, BP
    Sandoh, H
    [J]. RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 2000, 34 (02): : 145 - 154
  • [7] Optimal (T, S)-policies in a discrete-time opportunity-based age replacement:: An empirical study
    Dohi, T.
    Kaio, N.
    Osaki, S.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (04): : 340 - 347
  • [8] Nonparametric adaptive opportunity-based age replacement strategies
    Coolen-Schrinjner, P
    Coolen, FPA
    Shaw, SC
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (01) : 63 - 81
  • [9] Opportunity-based age replacement policy with minimal repair
    Jhang, JP
    Sheu, SH
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 1999, 64 (03) : 339 - 344
  • [10] Opportunity-based age replacement with different intensity rates
    Satow, T
    Osaki, S
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2003, 38 (11-13) : 1419 - 1426