A real-time multiple tunneling parameter prediction method of TBM steady phase based on dual recurrent neural networks

被引:0
|
作者
Yu S. [1 ]
Xu J. [1 ]
Hu J. [1 ]
Li J. [2 ]
Liu J. [1 ]
Chen H. [1 ]
Guan Y. [1 ]
Xu K. [3 ]
Zhang T. [1 ,3 ]
机构
[1] School of Electromechanical Engineering, Guangdong University of Technology, Guangzhou
[2] School of Intelligent Engineering, Shaoguan University, Shaoguan
[3] School of Mechanical Engineering and Automation, Beihang University, Beijing
基金
中国国家自然科学基金;
关键词
Division of tunneling phases; Machine learning; Recurrent neural network; Tunnel boring machine; Tunnelling parameter prediction;
D O I
10.1007/s00521-024-09912-7
中图分类号
学科分类号
摘要
Due to the uncertainty of geological conditions during the tunneling process, advanced prediction of TBM tunneling parameters is significant for evaluating operational safety and efficiency, especially for real-time prediction of key tunneling parameters during the steady phase of TBM operation. At present, although there are studies on constructing predictive models based on machine learning algorithms, multiparameter prediction consistent with the actual tunneling process remains challenging due to the complexity of the TBM tunneling process and the numerous tunneling parameters. Therefore, this paper proposes a real-time multiple tunneling parameters prediction method of TBM steady phase based on dual recurrent neural networks. Firstly, the irregular multidimensional time series of tunneling parameters are analyzed and processed, which are divided into an idle-push phase, a rising phase, and a steady phase; secondly, the parameters of rising phase are analyzed using a recurrent neural network, and the parameters relevant for constructing a real-time prediction model are screened; then, based on the screened parameters, the Bayesian-optimized gated recurrent unit (GRU, a kind of recursive neural network) is proposed to construct a real-time prediction model for the four key tunneling parameters during the steady phase. Finally, the effectiveness and practicality of the proposed method are demonstrated by verification on real TBM tunnel datasets and comparing it with the models constructed by six commonly used machine learning algorithms. The results of this paper show that the designed prediction method is able to achieve a good combination of performance in terms of accuracy and computational time-consumption, with an average prediction accuracy of 91.1% for the four parameters for different rock grades of geology, the multiparameter prediction time for 100 samples is only 11 ms. In addition, three current similar studies using deep learning methods were compared to demonstrate the superiority of this proposal. As a method more closer to practical application, this work provides guidance for the forward-looking prediction of TBM tunneling parameters. © The Author(s), under exclusive licence to Springer-Verlag London Ltd., part of Springer Nature 2024.
引用
收藏
页码:15981 / 16000
页数:19
相关论文
共 50 条
  • [1] Recurrent neural networks for real-time prediction of TBM operating parameters
    Gao, Xianjie
    Shi, Maolin
    Song, Xueguan
    Zhang, Chao
    Zhang, Hongwei
    AUTOMATION IN CONSTRUCTION, 2019, 98 : 225 - 235
  • [2] Real-Time Prediction of Operating Parameter of TBM during Tunneling
    Lee, Hang-Lo
    Song, Ki-Il
    Qi, Chongchong
    Kim, Jin-Seop
    Kim, Kyoung-Su
    APPLIED SCIENCES-BASEL, 2021, 11 (07):
  • [3] QPP: Real-Time Quantization Parameter Prediction for Deep Neural Networks
    Kryzhanovskiy, Vladimir
    Balitskiy, Gleb
    Kozyrskiy, Nikolay
    Zuruev, Aleksandr
    2021 IEEE/CVF CONFERENCE ON COMPUTER VISION AND PATTERN RECOGNITION, CVPR 2021, 2021, : 10679 - 10687
  • [4] Real-Time Prediction of Taxi Demand Using Recurrent Neural Networks
    Xu, Jun
    Rahmatizadeh, Rouhollah
    Boloni, Ladislau
    Turgut, Damla
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2018, 19 (08) : 2572 - 2581
  • [5] Optimization of a real-time simulator based on Recurrent Neural Networks for compressor transient behavior prediction
    Venturini, M.
    PROCEEDINGS OF THE ASME TURBO EXPO 2006, VOL 5, PTS A AND B, 2006, : 543 - 555
  • [6] Optimization of a real-time simulator based on recurrent neural networks for compressor transient behavior prediction
    Venturini, M.
    JOURNAL OF TURBOMACHINERY-TRANSACTIONS OF THE ASME, 2007, 129 (03): : 468 - 478
  • [7] Real-time prediction of drilling forces inside lunar regolith based on recurrent neural networks
    Xu, Jinchang
    Yuan, Xinyue
    Zhang, Yinliang
    Yu, Shuangfei
    Pang, Yong
    Zhang, Tao
    Xu, Kun
    Ding, Xilun
    ACTA ASTRONAUTICA, 2022, 201 : 259 - 273
  • [8] Development and Real-Time Implementation of Recurrent Neural Networks for AFR Prediction and Control
    Arsie, Ivan
    Pianese, Cesare
    Sorrentino, Marco
    SAE INTERNATIONAL JOURNAL OF PASSENGER CARS-ELECTRONIC AND ELECTRICAL SYSTEMS, 2009, 1 (01): : 403 - 412
  • [9] REAL-TIME MOTION PLANNING METHOD BASED ON NEURAL NETWORKS FOR MULTIPLE MOBILE ROBOTS
    Zhan Qiang Zhang Qixian Robot Research Institute
    Chinese Journal of Mechanical Engineering(English Edition), 2001, (01) : 1 - 4
  • [10] Real-time motion planning method based on neural networks for multiple mobile robots
    Zhan, Qiang
    Zhang, Qixian
    Wang, Shuguo
    Chinese Journal of Mechanical Engineering (English Edition), 2001, 14 (01): : 1 - 4