A bi-level programming methodology for decentralized mining supply chain network design

被引:1
|
作者
Zhang, Qiang [1 ]
Liu, Shi Qiang [1 ]
D'Ariano, Andrea [2 ]
Chung, Sai-Ho [3 ]
Masoud, Mahmoud [4 ,5 ]
Li, Xiangong [6 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou, Peoples R China
[2] Roma Tre Univ, Dept Civil Comp Sci & Aeronaut Technol Engn, Rome, Italy
[3] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Hong Kong, Peoples R China
[4] King Fahd Univ Petr & Minerals, Business Sch, Dept Informat Syst & Operat Management, Dhahran, Saudi Arabia
[5] King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Smart Mobil & Logist, Dhahran, Saudi Arabia
[6] China Univ Min & Technol, Sch Mines, Xuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Mining supply chain; Decentralized supply chain network design; Bi-level programming; Hybrid math-heuristic algorithm; Sine cosine algorithm; Differential evolution; PARTICLE SWARM OPTIMIZATION; DIFFERENTIAL EVOLUTION; PARAMETER DESIGN; DECISION-MAKING; MODEL; ALGORITHM; OPTIMIZERS; FLIGHT; SOLVE;
D O I
10.1016/j.eswa.2024.123904
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Since the outbreak of the COVID-19 pandemic, reshaping global supply chains for bulk mining commodities, such as coal, copper, and iron ore, has posed significant challenges. The complexity and multi-stakeholder nature of mining supply chain network design (MSCND) require innovative optimization approaches. However, traditional literature often focuses on centralized MSCND strategies, neglecting the competitive dynamics and conflicts of interest among stakeholders. To address this gap, this study introduces a bi-level programming (BLP) model for decentralized MSCND, capturing interactions between upper-level ore production and lowerlevel ore processing enterprises. To overcome the computational complexity of the BLP model, we develop a novel hybrid math-heuristic algorithm called Sine Cosine and Differential Evolution Algorithm with Constraint Repair Mechanism (SCDEA-CRM). The proposed SCDEA-CRM integrates the search mechanisms of sine cosine and differential evolution algorithms, along with a novel constraint repair mechanism to fix infeasible solutions caused by chemical composition imbalances between raw ores and products. Numerical experiments demonstrate the SCDEA-CRM's superior performance in solving the BLP model. A real -world case study in a decentralized iron ore supply chain validates the model's practical applicability and highlights its advantages over the centralized counterpart model. A sensitivity analysis is conducted to assess the impact of product iron content variations on supply chain costs.
引用
收藏
页数:21
相关论文
共 50 条
  • [1] A Gray Programming Model for Bi-Level Distribution Network Designing in the Supply Chain
    Han, Jin-fang
    Liu, Zhi-yong
    [J]. 2009 INTERNATIONAL SYMPOSIUM ON WEB INFORMATION SYSTEMS AND APPLICATIONS, PROCEEDINGS, 2009, : 264 - 266
  • [2] A Solution to Interval Linear Bi-level Programming and Its Application in Decentralized Supply Chain Planning
    Wang, Jianzhong
    Du, Gang
    [J]. IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2035 - 2038
  • [3] A bi-level programming model for decentralized manufacturer-distributer supply chain considering cooperative advertising
    Amirtaheri, O.
    Zandieh, M.
    Dorri, B.
    [J]. SCIENTIA IRANICA, 2018, 25 (02) : 891 - 910
  • [4] A bi-level programming model for sustainable supply chain network design that considers incentives for using cleaner technologies
    Chalmardi, Mazyar Kaboli
    Camacho-Vallejo, Jose-Fernando
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 213 : 1035 - 1050
  • [5] An optimization model for two-echelon distribution network design in supply chain based on bi-level programming
    Sun, HJ
    Gao, ZY
    [J]. PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 20 - 23
  • [6] Transit Network Design Based on the Bi-Level Programming
    Sun, Min
    [J]. 4TH INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT (ICEM), 2017, : 392 - 395
  • [7] A bi-level programming for bus lane network design
    Yu Bin
    Kong Lu
    Sun Yao
    Yao Baozhen
    Gao Ziyou
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2015, 55 : 310 - 327
  • [8] A Fuzzy Bi-level Programming Modeling Method in Supply Chain Management
    Deng Wei
    Xiong Yinping
    [J]. 2009 ISECS INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT, VOL III, 2009, : 372 - +
  • [9] Bi-level programming problem in the supply chain and its solution algorithm
    Haiyan Luo
    Linzhong Liu
    Xun Yang
    [J]. Soft Computing, 2020, 24 : 2703 - 2714
  • [10] Bi-level programming problem in the supply chain and its solution algorithm
    Luo, Haiyan
    Liu, Linzhong
    Yang, Xun
    [J]. SOFT COMPUTING, 2020, 24 (04) : 2703 - 2714