The MOVIDA Project to Support the Update of Flood Risk Maps in the Po River District: methodology for flood damage assessment

被引:0
|
作者
Ballio, Francesco [1 ]
Armaroli, Clara [2 ]
Arosio, Marcello [2 ]
Arrighi, Chiara [3 ]
Borgogno-Mondino, Enrico [4 ]
Carisi, Francesca [5 ]
Castelli, Fabio [3 ]
Ciavola, Paolo [6 ]
De Biaggi, Silvia [6 ]
Di Pietro, Gianni [7 ]
Domeneghetti, Alessio [5 ]
Duo, Enrico
Farina, Gabriele [8 ]
Gallazzi, Alice
Ghilardi, Federica
Giusti, Riccardo [2 ]
Hammouti, Mohammed [9 ]
Luino, Fabio [10 ]
Martina, Mario L. V. [2 ]
Molinari, Daniela
Monteleone, Beatrice [2 ]
Petruccelli, Natasha [5 ]
Pilotti, Marci
Scorzini, Anna Rita [7 ]
Simonelli, Tommaso [11 ]
Sterlacchini, Simone [9 ]
Turconi, Laura [10 ]
Vasini, Cesare [1 ]
Zazzeri, Marco
Zoppi, Laura [11 ]
机构
[1] Politecn Milan, Dept Civil & Environm Engn, Milan, Italy
[2] Univ Sch Adv Studies IUSS Pavia, Dept Sci Technol & Soc, Pavia, Italy
[3] Univ Florence, Dept Civil & Environm Engn, Florence, Italy
[4] Univ Turin, Dept Agr Forest & Food Sci, Turin, Italy
[5] Univ Bologna, Dept Civil Chem Environm & Mat Engn, Bologna, Italy
[6] Univ Ferrara, Dept Phys & Earth Sci, Ferrara, Italy
[7] Univ LAquila, Dept Civil Environm & Architectural Engn, Laquila, Italy
[8] Univ Brescia, Dept Civil Environm Architectural Engn & Math, Brescia, Italy
[9] CNR, Res Inst Environm Geol & Geoengn, Milan, Italy
[10] CNR, Res Inst Geohydrol Protect, Turin, Italy
[11] Po River Dist Author, Parma, Italy
关键词
Flood damage; Floods Directive; MOVIDA; PO River District; Italy; MODELS; INSYDE;
D O I
10.3850/IAHR-39WC2521716X20221136
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Effective planning of flood risk mitigation strategies requires to assess costs and benefits of alternatives of intervention, in terms of required investments and impacts avoided. For this reason, the European Commission asks Member States to develop and periodically update flood hazard and risk maps, to be used at the basis of Flood Risk Management Plans. Flood damage assessment and mapping is a critical step in such a process, due to the lack of consolidated practice both in the literature and the technical domains; this results in the present availability of mostly qualitative damage maps, with limited usability for flood risk management. By allowing scientists and practitioners working together, the MOVIDA project developed a newly procedure, embracing state of art damage models and knowledge on damage mechanisms, for an analytical assessment and mapping of flood damage in the Italian territory, with specific reference to the Po River District (North of Italy). The procedure was specifically conceived to support cos-benefits or multi-criteria analyses of flood risk mitigation measures, focusing on all categories of exposed assets and suppling, when achievable, a monetary evaluation of flood damage. The procedure was successfully implemented in the areas of potentially significant flood risk (APSFRS) in the district; results represent a significant improvement with respect to presently available damage maps, both in terms of assets considered and information supplied.
引用
收藏
页码:6653 / 6657
页数:5
相关论文
共 50 条
  • [1] Review and update of the flood risk management plan for the river basin district of Catalonia
    Blasco Hedo, Eva
    ACTUALIDAD JURIDICA AMBIENTAL, 2023, (137): : 151 - 152
  • [2] A Revised Approach to Flood Damage Estimation in Flood Risk Maps and Flood Risk Management Plans, Poland
    Godyn, Izabela
    WATER, 2021, 13 (19)
  • [3] Segmentation of coherence maps for flood damage assessment
    Giordano, F
    Goccia, M
    Dellepiane, S
    2005 International Conference on Image Processing (ICIP), Vols 1-5, 2005, : 2229 - 2232
  • [4] Evolution of flood risk over large areas: Quantitative assessment for the Po river
    Domeneghetti, Alessio
    Carisi, Francesca
    Castellarin, Attilio
    Brath, Armando
    JOURNAL OF HYDROLOGY, 2015, 527 : 809 - 823
  • [5] Methodology for Generating Flood Risk Maps in Urban Areas
    Hugo Alcocer-Yamanaka, Victor
    Manuel Rodriguez-Varela, Jose
    Javier Bourguett-Ortiz, Victor
    Jesus Llaguno-Guilberto, Oscar
    Misael Albornoz-Gongora, Pedro
    TECNOLOGIA Y CIENCIAS DEL AGUA, 2016, 7 (05) : 33 - 56
  • [6] A new assessment methodology for flood risk: a case study in the Indus River basin
    Kwak, Youngjoo
    Hasegawa, Akira
    Inomata, Hironori
    Magome, Jun
    Fukami, Kazuhiko
    Takeuchi, Kuniyoshi
    RISK IN WATER RESOURCES MANAGEMENT, 2011, 347 : 55 - +
  • [7] Incorporating river morphological changes to flood risk assessment: uncertainties, methodology and application
    Neuhold, C.
    Stanzel, P.
    Nachtnebel, H. P.
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2009, 9 (03) : 789 - 799
  • [8] Development of Flood Inundation Maps and Quantification of Flood Risk in an Urban Catchment of Brahmaputra River
    Sahoo, Sanat Nalini
    Sreeja, Pekkat
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2017, 3 (01):
  • [9] Software Support of the Risk Reduction Assessment in the ValueSec Project Flood Use Case
    Baginski, Jacek
    NEW RESULTS IN DEPENDABILITY AND COMPUTER SYSTEMS, 2013, 224 : 11 - 24
  • [10] A decision support framework for flood risk assessment: an application to the Brahmaputra River in Bangladesh
    Babel, Mukand S.
    Fakhruddin, S. H. M.
    Kawasaki, Akiyuki
    FLOODS: FROM RISK TO OPPORTUNITY, 2013, 357 : 263 - +