Double-Layer and Multi-objective Constraint Optimization Model for Transportation Scheduling of Molten Iron

被引:0
|
作者
Ma L. [1 ,2 ]
Hu C. [3 ]
Jin F. [3 ]
Dong W. [4 ]
机构
[1] School of Information Science and Technology, Southwest Jiaotong University, Chengdu
[2] The Center of National Railway Intelligent Transportation System Engineering and Technology, Beijing
[3] Institute of Computing Technologies, China Academy of Railway Sciences Corporation Limited, Beijing
[4] The Transportation Department of Maanshan Iron and Steel Co., Ltd., Maanshan
关键词
constraint optimization; lexicographic multi-objective; molten iron transportation; operation scheduling; search algorithm;
D O I
10.3969/j.issn.0258-2724.20220008
中图分类号
学科分类号
摘要
In order to realize the collaborative optimization of operation scheduling and resource allocation in molten iron transportation, based on the theory of the cumulative scheduling with constraint programming and lexicographic multi-objective optimization, a double-layer and multi-objective constraint optimization method is explored for the transportation scheduling of molten iron. Firstly, setting the highest turnover rate of molten iron tanks and the highest operation efficiency as two lexicographic objectives, the upper-level constraint optimization model is built for molten iron transportation operation. In the model, the constraints are involved, such as operation sequence, operation implementation logic, time limit of molten iron cooling, limited operation times of molten iron tank, resource capacity limit, and resource pool of the molten iron tanks. Secondly, with the highest resource utilization balance, the lower-level constrained optimization model is established for resource allocation in molten iron transportation, in which the uniqueness of operation implementation and resource capacity are taken as constraints. Finally, the hybrid algorithm of constraint propagation and multi-point constructive search is developed to solve the whole model iteratively. The case study shows that, the turnover rate target and transportation efficiency target obtained by the hybrid algorithm are 14.29% and 60.53% higher than those obtained by the basic depth first backtracking algorithm respectively. Compared with weighted and single objective models, lexicographical multi-objective model improves the efficiency and quality of solution by 20.3% and 11.11%, respectively. © 2023 Science Press. All rights reserved.
引用
收藏
页码:357 / 366and397
相关论文
共 15 条
  • [1] LI Weigang, YE Xin, ZHAO Yuntao, Simulation of iron melt transportation dispatching system, Journal of Computer Applications, 39, S2, pp. 206-210, (2019)
  • [2] LU Shaowen, LUO Xiaochuan, Design of multiscenario simulation of molten iron logistics system with cranes and cross-train AGVs, Journal of System Simulation, 29, 10, pp. 2549-2555, (2017)
  • [3] ZHAO Yeqing, Modeling of molten iron transportation system in the steel enterprise based on time influence net and time Petri net, Metallurgical Industry Automation, 39, 2, pp. 35-40, (2015)
  • [4] TANG L, JING G, HU G., Steelmaking and refining coordinated scheduling problem with waiting time and transportation consideration[J], Computers & Industrial Engineering, 58, 2, pp. 239-248, (2010)
  • [5] FAN Bo, CAI Lecai, Research on scheduling optimization model of hot metal can of system, Journal of Sichuan University of Science & Engineering (Natural Science Edition), 27, 1, pp. 49-52, (2014)
  • [6] YANG Xiaoyan, CUI Bingmou, Molten iron transportation scheduling optimization and simulation of iron and steel enterprises, Journal of Computer Applications, 33, 10, pp. 2977-2980, (2013)
  • [7] CHEN Zaigen, LI Ziyang, LU Min, Et al., Research on dynamic balance and real-time scheduling of HM logistics in large steel enterprise[J], Computer Applications and Software, 29, 8, pp. 115-117, (2012)
  • [8] PANG Xinfu, HUANG Hui, JIANG Yingchun, Et al., Hot metal production scheduling method for torpedo car transportation, Computer Integrated Manufacturing Systems, 24, 6, pp. 1468-1482, (2018)
  • [9] HUANG Hui, CHAI Tianyou, ZHENG Binglin, Et al., Design and development of molten iron scheduling simulation system, Journal of System Simulation, 24, 6, pp. 1192-1199, (2012)
  • [10] HUANG Hui, LUO Xiaochuan, ZHENG Binglin, Et al., Hot metal rescheduling method and its application between the iron-making and steel-making stages, Journal of Systems Engineering, 28, 2, pp. 234-247, (2013)