Comparison of time-invariant and adaptive linear grey-box models for model predictive control of residential buildings

被引:2
|
作者
Yu, Xingji [1 ,2 ]
Ren, Zhengru [3 ]
Liu, Peng [4 ]
Imsland, Lars [5 ]
Georges, Laurent [2 ]
机构
[1] Jiangsu Univ Sci & Technol, Coll Automat, Zhenjiang 212003, Peoples R China
[2] Norwegian Univ Sci & Technol, Fac Engn, Dept Energy & Proc Engn, NTNU, Kolbjorn Hejes Vei 1a, N-7034 Trondheim, Norway
[3] Tsinghua Univ, Shenzhen Int Grad Sch, Inst Ocean Engn, Shenzhen 518055, Peoples R China
[4] SINTEF Community, Dept Architecture Mat & Struct, Trondheim, Norway
[5] NTNU Norwegian Univ Sci & Technol, Fac Informat Technol & Elect Engn, Dept Engn Cybernet, OS Bragstads Plass 2, N-7034 Trondheim, Norway
关键词
Model predictive control; Grey -box modeling; Building thermal mass; Adaptive model; DEMAND RESPONSE; VALIDATION; MANAGEMENT; PART;
D O I
10.1016/j.buildenv.2024.111391
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Model predictive control (MPC) is a promising optimal control technique for activating building energy flexibility using its thermal mass. The performance of the MPC controller is directly related to the accuracy of the model prediction. Grey -box models, based on physical laws and calibrated on measurement data, are commonly used to represent the building thermal dynamics in MPC. Most research works use Linear Time -Invariant (LTI) grey -box models even though weather conditions vary significantly throughout the heating season. This is critical as inaccurate model prediction can lead to a lower performance of the MPC controller. This study introduces two adaptive MPC schemes to overcome this limitation of LTI models. The first one, called the Partially Adaptive MPC, only updates the effective window area of the prediction model. The second one, called the Fully Adaptive MPC, updates all the parameters of the grey -box model. The adaptive MPC performance is compared with MPC using LTI models in two different tests. The simulation -based results show that MPC based on LTI performs well if the control model is trained during a period with similar weather conditions as the period when the MPC will be applied. The Partially Adaptive MPC is unable to deliver satisfactory prediction performance due to the limited number of parameters that are updated. The Fully Adaptive MPC has the best performance compared to the other MPCs, especially as it avoids thermal comfort violations.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Comparison of time-invariant and adaptive linear grey-box models for model predictive control of residential buildings
    Yu, Xingji
    Ren, Zhengru
    Liu, Peng
    Imsland, Lars
    Georges, Laurent
    Building and Environment, 2024, 254
  • [2] Grey-box model for model predictive control of buildings
    Klanatsky, Peter
    Veynandt, Francois
    Heschl, Christian
    ENERGY AND BUILDINGS, 2023, 300
  • [3] IMPACT OF THE HEAT EMISSION SYSTEM ON THE IDENTIFICATION OF GREY-BOX MODELS FOR RESIDENTIAL BUILDINGS
    Reynders, Glenn
    Diriken, Jan
    Saelens, Dirk
    6TH INTERNATIONAL BUILDING PHYSICS CONFERENCE (IBPC 2015), 2015, 78 : 3300 - 3305
  • [4] Predictive control of sewer systems by means of grey-box models
    Carstensen, J
    Nielsen, MK
    Harremoes, P
    WATER SCIENCE AND TECHNOLOGY, 1996, 34 (3-4) : 189 - 194
  • [5] On Formulation and Training of Grey-box Thermal Model for Low-rise Residential Buildings
    Shi, Zixiao
    Newsham, Guy
    Pardasani, Ajit
    Gunay, H. Burak
    PROCEEDINGS OF BUILDING SIMULATION 2019: 16TH CONFERENCE OF IBPSA, 2020, : 838 - 844
  • [6] An adaptive real-time grey-box model for advanced control and operations in WRRFs
    Yang, Cheng
    Seiler, Peter
    Belia, Evangelia
    Daigger, Glen T.
    WATER SCIENCE AND TECHNOLOGY, 2021, 84 (09) : 2353 - 2365
  • [7] Investigation of the Model Structure for Low-Order Grey-Box Modelling of Residential Buildings
    Yu, Xingji
    Georges, Laurent
    Knudsen, Michael Dahl
    Sartori, Igor
    Imsland, Lars
    PROCEEDINGS OF BUILDING SIMULATION 2019: 16TH CONFERENCE OF IBPSA, 2020, : 5076 - 5083
  • [8] Identification of multi-zone grey-box building models for use in model predictive control
    Arroyo, Javier
    Spiessens, Fred
    Helsen, Lieve
    JOURNAL OF BUILDING PERFORMANCE SIMULATION, 2020, 13 (04) : 472 - 486
  • [10] Grey-box modeling and model predictive control for cascade-type PEMFC
    Barzegari, Mohammad M.
    Alizadeh, Ebrahim
    Pahnabi, Amir H.
    ENERGY, 2017, 127 : 611 - 622