In-situ Pressure Measurements in Gavunda Hydropower Tunnel during Full Operation

被引:0
|
作者
Andersson, L. R. [1 ]
Andreasson, P. [2 ]
机构
[1] Lulea Univ Technol, Lulea, Sweden
[2] Vattenfall Res & Dev AB, Alvkarleby, Sweden
关键词
Case-study; Hydropower; Pressure-Measurements;
D O I
10.3850/IAHR-39WC2521716X20221775
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Hundreds of miles of Hydropower tunnels have been excavated in Sweden the last four decades. They are of utmost importance to the hydropower industry, yet they are frequently subjected to rock falls or worse (Bratveit, et. al., 2016), in addition, information regarding the flow situation inside the tunnels are scarce. Simulations within Gavunda water tunnel has shown a strong correlation between changes in cross-sectional area and pressure (Andersson, Hellstram, Andreasson, & Lundstrom, 2019). Thus, conclusions about the cross-section can be deduced from measuring the pressure inside water tunnels. These results have also been experimentally validated (Aberle, et. al., 2020). However, measuring inside water tunnels is an arduous process, inaccessibility and a generally inhospitable environment makes use of expensive ROV's not preferable. In this project the design of an autonomous probe, which will sample the pressure inside the tunnel, has been evaluated. The probe will be small, easy to use and cheap in order to be easily replaced in case it is lost or destroyed during operation. Inside the tunnel the sensor will move laterally due to local flow disturbances, these movements will introduce noise in the pressure measurements. In order to account for this noise the probe has been equipped with an BN0055 Inertial Measurement Unit (IMU). The IMU allows for 9-degrees of freedom measurement of acceleration, containing an accelerometer, a gyroscope and a magnetometer. Using the IMU, the pressure variations due to movement can be separated from the pressure variations due to the change in cross-section.
引用
收藏
页码:2875 / 2879
页数:5
相关论文
共 50 条
  • [1] Impact of dust loads in long railway tunnels: In-situ measurements and consequences for tunnel facilities and operation
    Sturm, Peter
    Fruhwirt, Daniel
    Steiner, Helmut
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 122
  • [2] In-situ pressure measurements of encapsulted gyroscopes
    Simon, I.
    Billat, S.
    Link, T.
    Nommensen, P.
    Aubert, J.
    Manoli, Y.
    TRANSDUCERS '07 & EUROSENSORS XXI, DIGEST OF TECHNICAL PAPERS, VOLS 1 AND 2, 2007,
  • [3] Full scale measurements of the operation of fire ventilation in a road tunnel
    Krol, Malgorzata
    Krol, Aleksander
    Koper, Piotr
    Wrona, Pawel
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 70 : 204 - 213
  • [4] Development of an in-situ cell for X-ray absorption measurements during fuel cell operation
    Roth, C
    Benker, N
    Mazurek, M
    Scheiba, F
    Fuess, H
    ADVANCED ENGINEERING MATERIALS, 2005, 7 (10) : 952 - 956
  • [5] In-situ test on diversion tunnel at Jinping II hydropower station I-test design
    Zhang, Chunsheng
    Chu, Weijiang
    Hou, Jing
    Chen, Xiangrong
    Wu, Xumin
    Liu, Ning
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (08): : 1691 - 1701
  • [6] IN-SITU STRESS MEASUREMENTS DURING DRILLING.
    Daneshy, A.A.
    Slusher, G.L.
    Chisholm, P.T.
    Magee, D.A.
    1600, (38):
  • [7] In-Situ Stress Measurements during Cobalt Electrodeposition
    Graciano, V. P.
    Bertocci, U.
    Stafford, G. R.
    JOURNAL OF THE ELECTROCHEMICAL SOCIETY, 2019, 166 (01) : D3246 - D3253
  • [8] In-situ test on diversion tunnel at Jinping II hydropower station II-analysis of results
    Chu, Weijiang
    Zhang, Chunsheng
    Chen, Pingzhi
    Cheng, Wuwei
    Zhang, Chen
    Liu, Ning
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (08): : 1702 - 1710
  • [9] In-situ measurements in Overconsolidated Clay: Earth Pressure at rest
    Eszter Kalman
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2012, 56 (02): : 239 - 244
  • [10] IN-SITU OBSERVATIONS OF GROWING PITS DURING TUNNEL ETCHING OF ALUMINUM
    MAKINO, E
    YAJIMA, T
    SHIBATA, T
    IKEDA, M
    TANNO, Y
    SUGANUMA, E
    MATERIALS TRANSACTIONS JIM, 1993, 34 (09): : 796 - 800