共 50 条
- [1] The cable force determination and optimization of the long-span concrete cable-stayed bridges [J]. STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 690 - 695
- [2] OPTIMUM CABLE-FORCE ADJUSTMENTS IN CONCRETE CABLE-STAYED BRIDGES [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1995, 121 (04): : 685 - 694
- [4] Optimization Method of Cable Force Stretching in the Confirming the Ideal State of Cable-stayed Bridges [J]. CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, 2011, : 96 - 99
- [5] TIME-DEPENDENT ANALYSIS AND CABLE STRETCHING FORCE OPTIMIZATION OF CONCRETE CABLE-STAYED BRIDGES [J]. CORAN 2011: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN NONLINEAR MODELS - STRUCTURAL CONCRETE APPLICATIONS, 2011, : 355 - 368
- [7] Optimization of cable preloading on cable-stayed bridges [J]. SMART SYSTEMS FOR BRIDGES, STRUCTURES, AND HIGHWAYS - SMART STRUCTURES AND MATERIALS 1997, 1997, 3043 : 248 - 259
- [8] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (01): : 68 - 79
- [10] DETERMINING THE RATIONAL COMPLETION CABLE FORCE OF CABLE-STAYED BRIDGES BY AN OPTIMIZATION METHOD [J]. 4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 316 - 319