共 50 条
- [1] Study on Coal Mine Fast Drilling Equipment and Blasting Key Technology [J]. PROCEEDINGS OF THE 2017 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ICEESD 2017), 2017, 129 : 26 - 30
- [2] KEY TECHNOLOGY FOR CONSTRUCTION OF BRIDGES AND TUNNELS OF YICHANG-WANZHOU RAILWAY [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 522 - 530
- [3] A Method of Safety-Quality-Schedule Knowledge Graph for Intelligent Management of Drilling and Blasting Construction of Railway Tunnels [J]. Wuhan Daxue Xuebao (Xinxi Kexue Ban)/Geomatics and Information Science of Wuhan University, 2022, 47 (08): : 1155 - 1164
- [4] Drilling accuracy: The key to successful blasting [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 1996, 197 (03): : 78 - 78
- [5] Rapid excavation of tunnels using innovative drilling and blasting techniques [J]. TUNNELLING IN ROCK BY DRILLING AND BLASTING, 2013, : 15 - 22
- [8] Development and prospect for centrifugal blasting modeling [J]. Yantu Lixue/Rock and Soil Mechanics, 2011, 32 (09): : 2827 - 2833
- [9] Development and prospect for centrifugal blasting modeling [J]. ROCK AND SOIL MECHANICS, 2011, 32 (09) : 2827 - 2833
- [10] Drilling and blasting in close proximity to an operating mass transit railway [J]. TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 1121 - 1126