共 39 条
- [1] YAO Ju-kun, YANG Jun-e, ZHU Sheng, Quality control in remanufacturing waste product, China Surface Engineering, 19, 1, pp. 115-117, (2006)
- [2] GUNGOR A, GUPTA S M., Disassembly sequence planning for products with defective parts in product recovery, Computer and Industrial Engineering, 35, 1, pp. 161-164, (1998)
- [3] ZHANG Xiu-fen, Complex product disassemblability analysis and structure design for low-carbon, (2011)
- [4] ZHU Zhuo-yue, XU Zhi-gang, SHEN Wei-dong, Et al., Selective-disassembly sequence planning based on genetic-bat algorithm, Journal of Zhejiang University: Engineering Science, 52, 11, pp. 2120-2127, (2018)
- [5] XIE Y, HUANG M, ZHONG Y, Et al., Disassembly sequence planning based on the simulated annealing and genetic algorithm, Mechanical Engineer, 1, pp. 44-48, (2007)
- [6] REN Y, TIAN G, ZHAO F, Et al., Selective cooperative disassembly planning based on multi-objective discrete artificial bee colony algorithm, Engineering Applications of Artificial Intelligence, 64, pp. 415-431, (2017)
- [7] ZHU B, SARIGECILI M., Disassembly information model incorporating dynamic capabilities for disassembly sequence generation, Robotics and CIM, 29, pp. 396-400, (2013)
- [8] MITROUCHEV P, WANG C, LU L X, Et al., Selective disassembly sequence generation based on lowest level disassembly graph method, The International Journal of Advanced Manufacturing Technology, 80, pp. 141-159, (2015)
- [9] LUO Y, PENG Q, GU P, Et al., Integrated multi-layer representation and ant colony search for product selective disassembly planning, Computers in Industry, 75, pp. 13-26, (2016)
- [10] XING Yu-fei, LI Jing-chun, ZHANG Jing-qiang, Parallel disassembly sequence planning method considering operation space constraints, Journal of Computer-Aided Design and Computer Graphics, 30, 9, pp. 1755-1764, (2018)