Construction safety risk assessment method of construction engineering based on improved SVM

被引:0
|
作者
Yin, Quan [1 ]
Zhou, Junqing [2 ]
Zhou, Yi [1 ]
Li, Zhi-Ping [1 ]
机构
[1] Hunan Engineering Research Center of Structural Safety and Disaster Prevention for Urban Underground Infrastructure, Hunan City University, Yiyang,413000, China
[2] Hunan Chemical Geological Engineering Investigation Co., Ltd., Changsha,410000, China
来源
关键词
Risk assessment;
D O I
10.1504/IJSD.2023.134411
中图分类号
学科分类号
摘要
引用
收藏
页码:329 / 343
相关论文
共 50 条
  • [1] Safety assessment of construction engineering based on combined algorithms
    Li Yancang
    Suo Juanjuan
    [J]. 2009 INTERNATIONAL CONFERENCE ON INTELLIGENT HUMAN-MACHINE SYSTEMS AND CYBERNETICS, VOL 1, PROCEEDINGS, 2009, : 47 - 50
  • [2] Credit risk assessment for Engineering construction
    Lu, Shibao
    Wu, Chengguo
    Huang, Qiang
    Sun, Dongyong
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT ENGINEERING AND INFORMATION TECHNOLOGY, VOLS 1 AND 2, 2009, : 286 - 289
  • [3] Safety Risk Assessment of Highway Bridge Construction Based on Cloud Entropy Power Method
    Li, Qingfu
    Zhou, Jianpeng
    Feng, Jinghe
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (17):
  • [4] Metro construction safety risk assessment based on the fuzzy AHP and the comprehensive evaluation method
    Zheng, Xin
    Ma, Fenghai
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1243 - 1248
  • [5] An improved alternative queuing method for occupational health and safety risk assessment and its application to construction excavation
    Liu, Ran
    Liu, Zheng
    Liu, Hu-Chen
    Shi, Hua
    [J]. AUTOMATION IN CONSTRUCTION, 2021, 126
  • [6] Comprehensive Assessment of Highway Construction Based on Extension Engineering Method
    Chen, Tao
    Sun, Jie
    [J]. INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC AND INFORMATION TECHNOLOGY (ICMEIT 2018), 2018, : 592 - 596
  • [7] Risk Assessment of Tunnel Construction Based on Improved Cloud Model
    Lin, C. J.
    Zhang, M.
    Li, L. P.
    Zhou, Z. Q.
    Liu, S.
    Liu, C.
    Li, T.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (03)
  • [8] CONSTRUCTION SAFETY RISK ASSESSMENT BASED ON THE PROJECTION PURSUIT MODEL
    Zhuo, Pingshan
    Wen, Shijia
    Zhang, Qi
    Luo, Junlong
    Jia, Lu
    [J]. JOURNAL OF NONLINEAR AND CONVEX ANALYSIS, 2023, 24 (07) : 1629 - 1639
  • [9] Safety Risk Assessment of Power Construction Project Based on the Vulnerability
    Yang, Taihua
    Zheng, Qinghua
    Wang, Yang
    Liu, Rui
    [J]. 2ND INTERNATIONAL CONFERENCE ON NEW ENERGY AND RENEWABLE RESOURCES (ICNERR 2017), 2017, : 108 - 112
  • [10] Safety risk assessment for vertical concrete formwork activities in civil engineering construction
    Lopez-Arquillos, Antonio
    Rubio-Romero, Juan Carlos
    Gibb, Alistair G. F.
    Gambatese, John A.
    [J]. WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2014, 49 (02): : 183 - 192