Dynamic Scheduling Scheme With Task Laxity for Data Relay Satellite Networks

被引:1
|
作者
Dai, Cui-Qin [1 ]
Zhang, Yu [1 ]
Yu, Fei Richard [2 ]
Chen, Qianbin [3 ]
机构
[1] Chongqing Univ Posts & Telecommun, Sch Commun & Informat Engn, Chongqing 400065, Peoples R China
[2] Shenzhen Univ, Shenzhen Key Lab Digital & Intelligent Technol & S, Shenzhen 518060, Peoples R China
[3] Chongqing Univ Posts & Telecommun, Engn Res Ctr Mobile Commun, Minist Educ, Chongqing 400065, Peoples R China
基金
中国国家自然科学基金;
关键词
Data relay satellite network (DRSN); guarantee ratio; processing time of tasks; task laxity; task scheduling; UNCERTAINTIES;
D O I
10.1109/TVT.2023.3317783
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
With the increase of spacecrafts, data relay satellite network (DRSN) plays an essential role in the space task transmission and processing through broad coverage and efficient information distribution of data relay satellites. However, the growing demand of space tasks and the limited number of satellite antenna lead to the conflicts between high-priority unpredictable tasks and common tasks with timely processing requirements, which further result in the decreasing scheduling efficiency of space tasks. In this paper, a dynamic scheduling scheme with task laxity (DSTL) is proposed to solve scheduling conflicts and enhance scheduling efficiency. Firstly, a task model in visible time window is analyzed according to the processing time limit of tasks and the intermittent connection nature of satellites under a constructed DRSN model. After that, the task laxity is defined by the deadline and execution time of tasks to judge the urgency of tasks, and the optimization problem is formulated to maximize the number of tasks and prioritize high priority tasks by calculating task laxity. Then, the DSTL scheme is designed via four stages, which are task preprocessing, task-resource matching, task-conflict assessment, task-resource updating. In DSTL, a task sorting method with task laxity is raised to arrange the priority of tasks; an urgent task scheduling algorithm (UTS) is put forward to prioritize unpredictable tasks; a task-conflict resolution algorithm (TCR) is brought up to assess conflicting tasks and reschedule them. Following that, an adaptive large neighborhood search algorithm combined with deadline-aware scheduling (ALNS-DAS) is presented to obtain the optimal scheduling scheme, which has the maximum number of completed tasks. The simulation results show that the DSTL can maximize the guarantee ratio of completed tasks and ensure timely processing with the increase of tasks demand.
引用
收藏
页码:2605 / 2620
页数:16
相关论文
共 50 条
  • [1] Flexible Task Scheduling in Data Relay Satellite Networks
    Wu, Guohua
    Luo, Qizhang
    Zhu, Yanqi
    Chen, Xinjiang
    Feng, Yanghe
    Pedrycz, Witold
    [J]. IEEE TRANSACTIONS ON AEROSPACE AND ELECTRONIC SYSTEMS, 2022, 58 (02) : 1055 - 1068
  • [2] Dynamic task scheduling method for relay satellite networks based on hierarchical reinforcement learning
    Liu, Runzi
    Ma, Tianci
    Wu, Weihua
    Yao, Chenhong
    Yang, Qinghai
    [J]. Tongxin Xuebao/Journal on Communications, 2023, 44 (07): : 207 - 217
  • [3] Dynamic Scheduling of Hybrid Tasks With Time Windows in Data Relay Satellite Networks
    He, Lijun
    Li, Jiandong
    Sheng, Min
    Liu, Runzi
    Guo, Kun
    Zhou, Di
    [J]. IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2019, 68 (05) : 4989 - 5004
  • [4] Dynamic scheduling method for data relay satellite networks considering hybrid system disturbances
    Zongling Li
    Xinjiang Chen
    Qizhang Luo
    Guohua Wu
    Ling Wang
    [J]. Complex & Intelligent Systems, 2024, 10 : 1483 - 1499
  • [5] Dynamic scheduling method for data relay satellite networks considering hybrid system disturbances
    Li, Zongling
    Chen, Xinjiang
    Luo, Qizhang
    Wu, Guohua
    Wang, Ling
    [J]. COMPLEX & INTELLIGENT SYSTEMS, 2024, 10 (01) : 1483 - 1499
  • [6] Satellite Relay Task Scheduling Based on Dynamic Antenna Setup Time and Splittable Task
    Liu, Hongyang
    Wang, Ying
    Yu, Peng
    Feng, Yining
    Li, Wenjing
    Qiu, Xuesong
    [J]. 2022 IEEE GLOBAL COMMUNICATIONS CONFERENCE (GLOBECOM 2022), 2022, : 3917 - 3922
  • [7] Two-Phase Task Scheduling in Data Relay Satellite Systems
    Deng, Boyu
    Jiang, Chunxiao
    Kuang, Linling
    Guo, Song
    Lu, Jianhua
    Zhao, Shanghong
    [J]. IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2018, 67 (02) : 1782 - 1793
  • [8] Preemptive Dynamic Scheduling Algorithm for Data Relay Satellite Systems
    Deng, Boyu
    Jiang, Chunxiao
    Kuang, Linling
    Guo, Song
    Ge, Ning
    Lu, Jianhua
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2017,
  • [9] A Dynamic Resource Scheduling Scheme in Edge Computing Satellite Networks
    Wang, Feng
    Jiang, Dingde
    Qi, Sheng
    Qiao, Chen
    Shi, Lei
    [J]. MOBILE NETWORKS & APPLICATIONS, 2021, 26 (02): : 597 - 608
  • [10] A Dynamic Resource Scheduling Scheme in Edge Computing Satellite Networks
    Feng Wang
    Dingde Jiang
    Sheng Qi
    Chen Qiao
    Lei Shi
    [J]. Mobile Networks and Applications, 2021, 26 : 597 - 608