共 50 条
- [2] Explored the fully-mechanized caving mining of water flowing fractured zone TRENDS IN BUILDING MATERIALS RESEARCH, PTS 1 AND 2, 2012, 450-451 : 1253 - +
- [3] Asymmetric failure and control measures of large cross-section entry roof with strong mining disturbance and fully-mechanized caving mining 2016, Academia Sinica (35): : 806 - 818
- [4] Principle of underground pressure control in fully-mechanized coal mining with solid filling and force analysis of mining support Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2010, 39 (06): : 795 - 801
- [5] Reasonable parameters of roof cutting entry retaining in thin immediate roof and large mining height fully-mechanized face Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (07): : 1981 - 1990
- [6] Main roof break structure and surrounding stability analysis in gob-side entry with fully-mechanized caving mining Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2019, 36 (03): : 446 - 454and464
- [9] Mechanical Analysis of Weakly Cemented Roof of Gob-side Entry Retaining in Fully-Mechanized Top Coal Caving Mining Geotechnical and Geological Engineering, 2019, 37 : 2977 - 2984