共 50 条
- [1] Rapid payback from downtime saved by universal calibrator British Plastics and Rubber, 2002, (MAY.):
- [2] Evaluation and improvement of productivity in high-speed NC machining JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2000, 122 (03): : 556 - 561
- [4] 7-MONTH PAYBACK PERIOD FOR MOOG NC MACHINE MACHINERY AND PRODUCTION ENGINEERING, 1975, 126 (3250): : 264 - 265
- [8] NC AND PRODUCTIVITY - NECESSARY FOR SURVIVAL INSTRUMENTS & CONTROL SYSTEMS, 1972, 45 (02): : 33 - &