FAILURE OF A MINE WASTE DUMP IN ZIMBABWE - CAUSES AND CONSEQUENCES

被引:36
|
作者
SHAKESBY, RA [1 ]
WHITLOW, JR [1 ]
机构
[1] UNIV ZIMBABWE,DEPT GEOG,HARARE,ZIMBABWE
来源
关键词
D O I
10.1007/BF01704668
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A combination of factors are considered important in causing the failure and subsequent development of a flowslide of a gold mine waste dump (or tailings dam) at Arcturus, near Harare, Zimbabwe. These factors comprise poor basal drainage, steep perimeter walls, saturation of the walls and basal sediments through continued spigoting of slurry during a period of heavy rainfall, and the effect of this saturation on the tailings. Properties of the tailings, eyewitness accounts, documentary evidence, and site characteristics are discussed. The failure and subsequent development of a fatal 300-m flowslide are reconstructed in a five-phase developmental model. The general applicability of the results is discussed.
引用
收藏
页码:143 / 153
页数:11
相关论文
共 50 条
  • [1] Investigation of a large-scale waste dump failure at the Mae Moh mine in Thailand
    Hoy, Menglim
    Doan, Cong Bien
    Horpibulsuk, Suksun
    Suddeepong, Apichat
    Udomchai, Artit
    Buritatum, Apinun
    Chaiwan, Apipat
    Doncommul, Prajueb
    Arulrajah, Arul
    ENGINEERING GEOLOGY, 2024, 329
  • [2] Numerical assessment of failure potential of a large mine waste dump in Panzhihua City, China
    Bao, Yiding
    Han, Xudong
    Chen, Jianping
    Zhang, Wen
    Zhan, Jiewei
    Sun, Xiaohui
    Chen, Menghe
    ENGINEERING GEOLOGY, 2019, 253 : 171 - 183
  • [3] Mine Overburden Dump Failure: A Case Study
    Poulsen B.
    Khanal M.
    Rao A.M.
    Adhikary D.
    Balusu R.
    Geotechnical and Geological Engineering, 2014, 32 (2) : 297 - 309
  • [4] Large scale failure of the external waste dump at the "South Field" lignite mine, Northern Greece
    Steiakakis, E.
    Kavouridis, K.
    Monopolis, D.
    ENGINEERING GEOLOGY, 2009, 104 (3-4) : 269 - 279
  • [5] ASSESSMENT OF GAMMA DOSE RATE AT MINE WASTE DUMP
    Dolhanczuk-Srodka, Agnieszka
    Wrobel, Lukasz
    Klos, Andrzej
    Waclawek, Maria
    ECOLOGICAL CHEMISTRY AND ENGINEERING S-CHEMIA I INZYNIERIA EKOLOGICZNA S, 2013, 20 (03): : 555 - 565
  • [6] SUBGRADE AND DUMP DEFORMATIONS CAUSED BY DUMPING OF MINE WASTE
    MULARZ, S
    RYBICKI, S
    ENGINEERING GEOLOGY, 1977, 11 (03) : 189 - 200
  • [7] Possibility of Mine Waste Dump remediation with Thermal Activity
    Zasterova, Petra
    Marschalko, Marian
    Durd'ak, Jan
    Niemiec, Dominik
    WORLD MULTIDISCIPLINARY EARTH SCIENCES SYMPOSIUM, WMESS 2015, 2015, 15 : 401 - 406
  • [8] Numerical simulation of hillside mine waste dump construction
    Teixeira, Marcilio Baltazar
    Nogueira, Christianne de Lyra
    de Oliveira Filho, Waldyr Lopes
    REM-REVISTA ESCOLA DE MINAS, 2012, 65 (04) : 553 - 559
  • [9] Sustainability Analysis of Waste Dump in Mine No. 4 of Golgohar, Sirjan, for Purpose of Increasing Waste Dump Volume
    Rezaei, Sajjad
    Rafiee, Ramin
    Ataei, Mohammad
    Javadi, Morteza
    JOURNAL OF MINING AND ENVIRONMENT, 2023, 14 (04): : 1373 - 1391
  • [10] Failure Management - Causes and Consequences of Failure
    Stasewitsch, Elena
    GIO-GRUPPE-INTERAKTION-ORGANISATION-ZEITSCHRIFT FUER ANGEWANDTE ORGANISATIONSPSYCHOLOGIE, 2016, 47 (02): : 199 - 201