VERIFICATION OF THE CASMO-3/SIMULATE-3 PIN POWER ACCURACY BY COMPARISON WITH OPERATING BOILING WATER-REACTOR MEASUREMENTS

被引:4
|
作者
UEGATA, T [1 ]
SAJI, E [1 ]
TANAKA, H [1 ]
机构
[1] TOKYO ELECT POWER CO LTD,FUKUSIMA 2 NUCL POWER STN,FUKUSHIMA 97906,JAPAN
关键词
D O I
10.13182/NSE93-A24017
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Intranodal pin power distributions calculated by the CASMO-3/SIMULATE-3 code have been compared with pin gamma scan measurements. These data were obtained from the depleted core of an operating boiling water reactor (BWR), which is more complicated than a pressurized water reactor to calculate because of the existence of coolant void distributions and cruciform control blades. Furthermore, measured bundles include mixed-oxide (MOX) bundles in which steep thermal flux gradients occur. Both UO2 and MOX bundles have been calculated in the same manner based on the standard CASMO-3/SIMULATE-3 methods. The total pin power root-mean-square (rms) error is 2.7%, which includes measurement error, from an 896-point comparison. There is no obvious dependency on axial elevations (void fractions) and no significant difference between fuel types (UO2 or MOX), although the errors in a peripheral bundle, which is less important from the standpoint of core design, are somewhat larger than those in the internal bundles. If the peripheral bundle is excluded, the total rms error is reduced to 2.2%. From these results, it is concluded that excellent agreement has been obtained between the calculations and measurements and that the calculational capability of CASMO-31 SIMULATE-3 for the intranodal pin power distribution is quite satisfactory and useful for BWR core design.
引用
收藏
页码:81 / 85
页数:5
相关论文
共 24 条
  • [1] BENCHMARK OF CASMO-3 SIMULATE-3 WITH A NEW MODELING FOR THE CHINSHAN AND KUOSHENG BOILING WATER-REACTORS
    KAO, PW
    YANG, JT
    HO, CY
    CHOU, CH
    HUANG, RC
    SUN, TC
    NUCLEAR TECHNOLOGY, 1992, 99 (02) : 222 - 234
  • [2] ANALYSES OF BOILING WATER-REACTOR MIXED-OXIDE CRITICAL EXPERIMENTS WITH CASMO-4 SIMULATE-3
    SAJI, E
    SHIRAYANAGI, H
    NUCLEAR SCIENCE AND ENGINEERING, 1995, 121 (01) : 52 - 56
  • [3] QUALIFICATION OF THE TAIWAN POWER COMPANY PRESSURIZED-WATER REACTOR-PHYSICS METHODS USING CASMO-3 SIMULATE-3
    HUANG, PH
    YANG, JT
    NUCLEAR TECHNOLOGY, 1994, 107 (02) : 138 - 154
  • [4] Analysis of actinide recycling in a Boiling Water Reactor using CASMO-4/SIMULATE-3
    Ramon Ramirez, J.
    Alonso, Gustavo
    Martinez, Eduardo
    Castillo, Rogelio
    Palacios, Javier C.
    PROGRESS IN NUCLEAR ENERGY, 2016, 89 : 26 - 38
  • [5] VERIFICATION OF THE SIMULATE-3 PIN POWER DISTRIBUTION CALCULATION
    DIGIOVINE, AS
    GORSKI, JP
    TREMBLAY, MA
    NUCLEAR SCIENCE AND ENGINEERING, 1989, 103 (04) : 420 - 426
  • [6] Qualification of the Taiwan Power Company's pressurized water reactor physics methods using CASMO-4/SIMULATE-3
    Lin, Hsien-Chuan
    Yaur, Shung-Jung
    Lin, Tzung-Yi
    Kuo, Weng-Sheng
    Shiue, Jin-Yih
    Huang, Yu-Lung
    NUCLEAR ENGINEERING AND DESIGN, 2012, 253 : 71 - 76
  • [7] SIMULATE-3 PIN POWER RECONSTRUCTION - METHODOLOGY AND BENCHMARKING
    REMPE, KR
    SMITH, KS
    HENRY, AF
    NUCLEAR SCIENCE AND ENGINEERING, 1989, 103 (04) : 334 - 342
  • [8] Extended discharge burnup optimization technique using Penn State's Fuel Management Package and CASMO-3/SIMULATE-3
    Feltus, Madeline Anne
    Annals of Nuclear Energy, 1995, 22 (05):
  • [9] AN EXTENDED DISCHARGE BURNUP OPTIMIZATION TECHNIQUE USING PENN-STATES FUEL-MANAGEMENT PACKAGE AND CASMO-3/SIMULATE-3
    FELTUS, MA
    ANNALS OF NUCLEAR ENERGY, 1995, 22 (05) : 267 - 274
  • [10] Hybrid analysis of the simplified boiling water reactor using RAMONA-4B and CASMO-3 computer codes
    Vivas, GFC
    Hassan, YA
    NUCLEAR TECHNOLOGY, 1999, 127 (03) : 287 - 300