Influence of pressure-relief of confined aquifer on existing tunnel under conditions of different inserted lengths of diaphragm wall

被引:0
|
作者
Zheng Gang [1 ,2 ]
Wang Qi [1 ,2 ]
Deng Xu [3 ]
Liu Qing-chen [3 ]
机构
[1] Tianjin Univ, Minist Educ, Key Lab Coast Civil Struct Safety, Tianjin 300072, Peoples R China
[2] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
[3] Tianjin Architecture Design Inst, Tianjin 300074, Peoples R China
关键词
confined aquifer; diaphragm wall; existing tunnel; pressure-relief of confined aquifer for dewatering;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
If the confined aquifer is not completely cut off by the diaphragm wall during the pressure-relief process which is used for preventing the heave failure of deep excavation, the sphere of influence of ground settlement caused by pressure-relief of confined aquifer is much larger than that caused by the excavation. Therefore, the deformation characteristics of the existing shield tunnels caused by pressure-relief of confined aquifer are simulated by finite element method; and then the diaphragm wall is inserted into the confined aquifer, the effect of the length of diaphragm wall into the confined aquifer on the deformation of tunnel is analyzed. The results show that, as the length of diaphragm wall inserted into the confined aquifer increases, the settlement of tunnel decreases. But because of the deformation of wall, horizontal movement of the tunnel is considerable during the pressure-relief process. So it should be pointed out that when the tunnel is close to the dewatering well, even there is a diaphragm wall cutting off the confined aquifer, the influence of dewatering on the horizontal deformation should be paid attention to. Besides, the long-term pressure-relief process will cause severe settlement of the tunnel; so it should be avoided when the confined aquifer is not completely cut off.
引用
收藏
页码:412 / +
页数:11
相关论文
共 10 条
  • [1] Chen Y.-C., 2008, CHIN J GEOTECH ENG, V30, P319
  • [2] [龚晓南 Gong Xiaonan], 2011, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V33, P145
  • [3] The equivalence of a jointed shield-driven tunnel lining to a continuous ring structure
    Lee, KM
    Ge, XW
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 2001, 38 (03) : 461 - 483
  • [4] LUO Guan-yong, 2004, ROCK SOIL MECH, V25, P196
  • [5] [骆祖江 LUO Zujiang], 2008, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V30, P193
  • [6] YE Wei-min, 2009, CHINESE J UNDERGROUN, V5, P1799
  • [7] Zheng G., 2008, CHIN J GEOTECH ENG, V30, P155
  • [8] [郑刚 Zheng Gang], 2014, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V36, P802
  • [9] ZHENG Gang, 2015, ROCK SOIL MECH, V36
  • [10] Zhong XC, 2011, ROCK SOIL MECH, V32, P132