JOB-SHOP SCHEDULING WITH RESOURCE-TIME MODELS OF OPERATIONS

被引:19
|
作者
GRABOWSKI, J
JANIAK, A
机构
[1] Technical Univ of Wroclaw, Wroclaw, Pol, Technical Univ of Wroclaw, Wroclaw, Pol
关键词
COMPUTER PROGRAMMING - Algorithms - OPERATIONS RESEARCH;
D O I
10.1016/0377-2217(87)90169-X
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The job-shop problems with allocation of continuously-divisible nonrenewable resource is considered. The mathematical models of operations are linear, decreasing functions with respect to an amount of resource. The objective is sequencing operations and allocation of constrained resource such that the project duration is minimized. Thus, the problem considered is a generalization of the classical job-shop problem. Some properties of the optimal solution are presented. The algorithm of solving this problem is based on the disjunctive graphs theory and branch-and-bound technique.
引用
收藏
页码:58 / 73
页数:16
相关论文
共 50 条
  • [1] JOB-SHOP SCHEDULING WITH CONVEX MODELS OF OPERATIONS
    JANIAK, A
    SZKODNY, T
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 1994, 20 (02) : 59 - 68
  • [2] Job-shop resource scheduling via simulating random operations
    Ben-Gurion Univ of the Negev, Beer Sheva, Israel
    [J]. Math Comput Simul, 5 (427-440):
  • [3] Job-shop resource scheduling via simulating random operations
    Golenko-Ginzburg, D
    Gonik, A
    [J]. MATHEMATICS AND COMPUTERS IN SIMULATION, 1997, 44 (05) : 427 - 440
  • [4] Resource constraints for preemptive job-shop scheduling
    Pape C.L.E.
    Baptiste P.
    [J]. Constraints, 1998, 3 (4) : 263 - 287
  • [5] Resource constraints for preemptive job-shop scheduling
    Pape, Claude L.E.
    Baptiste, Philippe
    [J]. Constraints, 1998, 3 (04): : 263 - 287
  • [6] Job-Shop Scheduling with Robot Synchronization for Transport Operations
    Gayon, Jean Philippe
    Lacomme, Philippe
    Oussama, Amine
    [J]. METAHEURISTICS, MIC 2024, PT I, 2024, 14753 : 28 - 42
  • [7] JOB-SHOP SCHEDULING
    NEW, C
    [J]. DATA PROCESSING, 1974, 16 (02): : 100 - 102
  • [8] JOB-SHOP SCHEDULING UNDER A NONRENEWABLE RESOURCE CONSTRAINT
    TOKER, A
    KONDAKCI, S
    ERKIP, N
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (08) : 942 - 947
  • [9] Job-shop scheduling in a body shop
    Schauer, Joachim
    Schwarz, Cornelius
    [J]. JOURNAL OF SCHEDULING, 2013, 16 (02) : 215 - 229
  • [10] Job-shop scheduling in a body shop
    Joachim Schauer
    Cornelius Schwarz
    [J]. Journal of Scheduling, 2013, 16 : 215 - 229