CONSTRUCTION DEVELOPMENT HEAD UNIT WHEN MINING WEAKLY STABLE ORE BODIES AT GREAT DEPTHS

被引:0
|
作者
Zherebko, L. N. [1 ]
Dzhangulova, G. K. [1 ]
Pivovarova, L. M. [1 ]
机构
[1] DA Kunaeva Inst Min, Alma Ata, Kazakhstan
关键词
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The design of artificial bottom block of reinforced concrete using a quick-yielding metal support SVP-22, SVP-27 is recommended for use in the design, located in an array of charged under the zone collapses, ensuring their stability, reliability, durability, clean-up rhythm. Specific reactivity of metallic yielding lining SP-28 when it is installed at 0.5 m is 37-42 t/m(2), representing only 7.5% of the pressure at the bottom caving. The use of artificial-governmental structures, at the very beginning of the preparation of the bottom works as a construction of the bottom-lining. The greatest resistance workings bottom provides a monolithic lining of the early strength concrete.
引用
收藏
页码:77 / 81
页数:5
相关论文
共 9 条
  • [1] STATE OF ORE PILLARS AT GREAT DEPTHS IN THE CONTINUOUS ROOM SYSTEM OF MINING
    LIPCHANSKII, BM
    [J]. SOVIET MINING SCIENCE USSR, 1978, 14 (05): : 526 - 528
  • [2] Problems of underground ore mining at great depths in Kryvyi Rih Basin
    Vilkul, Yuriy
    Kaplenko, Yuriy
    Stupnik, Mykola
    Sydorenko, Victor
    [J]. NEW TECHNOLOGICAL SOLUTIONS IN UNDERGROUND MINING: INTERNATIONAL MINING FORUM 2006, 2006, : 153 - 159
  • [3] Ore Mining of Kutnohorsko and its Economic Importance for Construction and Development
    Duraj, Milos
    Niemiec, Dominik
    Sombathy, Erik
    Marschalko, Marian
    Yilmaz, Isik
    Matuszkova, Barbara
    Montero, Orlando Arencibia
    Yang, Shuran
    [J]. 4TH WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM - WMCAUS, 2019, 603
  • [4] Ore dilution control when mining low-thickness ore bodies using a system of sublevel drifts
    Mussin, Aibek
    Kydrashov, Adilzhan
    Asanova, Zhanar
    Abdrakhman, Yerbolsyn
    Ivadilinova, Dina
    [J]. MINING OF MINERAL DEPOSITS, 2024, 18 (02): : 18 - 27
  • [5] DEVELOPMENT OF GEOMECHANICAL PROVISION ROOM-AND-PILLAR SYSTEM OF ROCK BURST ORE DEPOSITS AT GREAT DEPTHS
    Sidorov, D. V.
    [J]. JOURNAL OF MINING INSTITUTE, 2013, 204 : 276 - 283
  • [6] Reduction of ore dilution when mining low-thickness ore bodies by means of artificial maintenance of the mined-out area
    Mussin, Aibek
    Imashev, Askar
    Matayev, Azamat
    Abeuov, Yerkebulan
    Shaike, Nurlan
    Kuttybayev, Aidar
    [J]. MINING OF MINERAL DEPOSITS, 2023, 17 (01): : 35 - 42
  • [7] ANALYTICAL METHOD FOR DETERMINING THE PARAMETERS TRANSMARGINAL DEFORMATION ORE FOR BUMP HAZARD ASSESSMENT FOR ORE DEPOSITS AT GREAT DEPTHS WHEN USING ROOM-AND-PILLAR SYSTEM
    Sidorov, D. V.
    [J]. JOURNAL OF MINING INSTITUTE, 2014, 208 : 277 - 282
  • [8] VALIDATION OF SAFE AND EFFICIENT MINING GEOTECHNOLOGIES FOR LOW THICKNESS STEEPLY DECLINING ORE BODIES AT DEPTHS ABOVE 1,000 M
    Avdeev, A. N.
    Sosnovskaya, E. L.
    Pavlov, A. M.
    [J]. PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2022, 2 : 169 - 180
  • [9] Geomechanics substantiation of pillars development parameters in case of combined mining the contiguous steep ore bodies
    Takhanov, Daulet
    Muratuly, Berikbol
    Rashid, Zhuldyz
    Kydrashov, Adilzhan
    [J]. MINING OF MINERAL DEPOSITS, 2021, 15 (01): : 50 - 58