共 50 条
- [1] SOME DEFECTS IN FLASH BUTT WELDING OF BOILER TUBES [J]. WELDING PRODUCTION, 1971, 18 (01): : 28 - &
- [2] PREHEATING IN FLASH-BUTT WELDING OF BOILER TUBES [J]. WELDING PRODUCTION, 1975, 22 (04): : 29 - 33
- [3] BUTT WELDING OF BOILER TUBES WITH HEATING BY HIGH-FREQUENCY CURRENTS [J]. WELDING PRODUCTION, 1972, 19 (04): : 34 - &
- [7] COLD BUTT WELDING OF ALUMINUM TUBES TO COPPER TUBES [J]. WELDING PRODUCTION, 1972, 19 (07): : 28 - 30
- [8] INSPECTION OF BUTT WELDS IN SMALL DIAMETER BOILER TUBES [J]. JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 1986, 108 (03): : 342 - 345
- [9] HIGH FREQUENCY INDUCTION WELDING OF BUTT JOINTS IN TUBES [J]. WELDING PRODUCTION, 1968, 15 (08): : 49 - &