EXACT SOLUTION OF THE NO-WAIT FLOWSHOP SCHEDULING PROBLEM WITH A COMPARISON TO HEURISTIC METHODS

被引:32
|
作者
PEKNY, JF [1 ]
MILLER, DL [1 ]
机构
[1] DUPONT CO,DEPT CENT RES & DEV,WILMINGTON,DE 19880
关键词
D O I
10.1016/0098-1354(91)85019-Q
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Intermediate storage utilization provides a key constraint in the scheduling of multistep batch processes. In some cases, unstable intermediates must be processed without delay at any production step so that intermediate storage may not be used. In a flowshop, such a no-wait scenario can be reduced to a traveling salesman problem. This paper details the application of an exact branch and bound algorithm for the traveling salesman problem to solve the no-wait flowshop scheduling problem. We present and solve an example problem typical of those found in the chemical industry. In addition, we present data comparing two-exchange and simulated annealing heuristics with the exact algorithm for various problem sizes.
引用
收藏
页码:741 / 748
页数:8
相关论文
共 50 条
  • [1] A hybrid heuristic algorithm for the no-wait flowshop scheduling problem
    Riahi, Vahid
    Kazemi, Morteza
    [J]. CSSE 2015 20th International Symposium on Computer Science and Software Engineering, 2015,
  • [2] A New Constructive Heuristic for the No-Wait Flowshop Scheduling Problem
    Mousin, Lucien
    Kessaci, Marie-Eleonore
    Dhaenens, Clarisse
    [J]. LEARNING AND INTELLIGENT OPTIMIZATION (LION 11 2017), 2017, 10556 : 196 - 209
  • [4] HEURISTIC ALGORITHMS FOR SCHEDULING IN THE NO-WAIT FLOWSHOP
    GANGADHARAN, R
    RAJENDRAN, C
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (03) : 285 - 290
  • [5] A NO-WAIT FLOWSHOP SCHEDULING HEURISTIC TO MINIMIZE MAKESPAN
    RAJENDRAN, C
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (04) : 472 - 478
  • [6] SOLVABLE CASES OF THE NO-WAIT FLOWSHOP SCHEDULING PROBLEM
    VANDERVEEN, JAA
    VANDAL, R
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1991, 42 (11) : 971 - 980
  • [7] A hybrid genetic algorithm for no-wait flowshop scheduling problem
    Tseng, Lin-Yu
    Lin, Ya-Tai
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 128 (01) : 144 - 152
  • [8] STOCHASTIC FLOWSHOP NO-WAIT SCHEDULING
    FROSTIG, E
    ADIRI, I
    [J]. JOURNAL OF APPLIED PROBABILITY, 1985, 22 (01) : 240 - 246
  • [9] Improved Exact Methods for Solving No-Wait Flowshop Scheduling Problems With Due Date Constraints
    Ying, Kuo-Ching
    Lu, Chung-Cheng
    Lin, Shih-Wei
    [J]. IEEE ACCESS, 2018, 6 : 30702 - 30713
  • [10] Minimizing makespan for solving the distributed no-wait flowshop scheduling problem
    Lin, Shih-Wei
    Ying, Kuo-Ching
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 99 : 202 - 209