A STOCHASTIC-MODEL OF AN UNRELIABLE KANBAN PRODUCTION SYSTEM

被引:0
|
作者
SCHMIDBAUER, H [1 ]
ROSCH, A [1 ]
机构
[1] UNIV MUNICH,SEMINAR ANGEW STOCHAST,D-80799 MUNICH,GERMANY
关键词
TRANSFER LINE; PULL SYSTEM; UNRELIABLE MACHINES; DECOMPOSITION ALGORITHM;
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We analyze a stochastic model of a production line with k stations (machines) in series. There are finite-capacity buffers between the machines and at the end of the line. The movement of the workpieces through the line is demand-driven, i.e. we deal with a pull (kanban) production system. Processing times are assumed to be deterministic and constant. There are two sources of randomness in the model: Demand for workpieces from outside is stochastic, and the machines may break down (and then be repaired) with a given probability. A demand from outside is lost if the final buffer is empty. This system is described by a discrete-time Markov chain. The steady-state distribution is given for k = 1. This is the basis of a decomposition algorithm which approximates the throughput of the line and the percentage of satisfied demand for arbitrary k. A comparison with simulation results shows that this algorithm is very accurate.
引用
收藏
页码:155 / 160
页数:6
相关论文
共 50 条