Development of a comprehensive model for construction project success evaluation by contractors

被引:37
|
作者
Heravi, Gholamreza [1 ]
Ilbeigi, Mohammad [1 ]
机构
[1] Univ Tehran, Sch Civil Engn, Tehran, Iran
关键词
Iran; Construction industry; Project management; Critical success factors; Project evaluation; Product success; Project management success; Critical performance indices; Contractor company;
D O I
10.1108/09699981211259603
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this paper is to develop a quantitative comprehensive model for construction project success evaluation, from the viewpoint of a contractor company. Design/methodology/approach - In this paper, the authors used a comprehensive definition of project success consisting of two components: Product success, which deals with the effect of the project's final product; and Project Management success, which focuses upon the project process. The research methodology includes five steps: identification of the critical performance indices for the two above mentioned components; quantification of the performance indices; normalization of the indices; integration of the various performance indices to develop an overall project performance function; and applying the model on a real project in Iran and analyzing the results. Findings - This paper introduces a novel model to evaluate and measure the construction project success from the viewpoint of a contractor company. The results show that this model can be used as a reliable tool to measure the project performance of contractors and their points of strength and weakness can be determined precisely. Practical implications - Analyzing the results of the case study shows that the evaluation model is absolutely applicable. All necessary elements to quantify the critical performance indices and overall project success can be recorded precisely and easily. Thus, this model can be used in every contractor company concerned about its projects' performance. Originality/value - The evaluation model proposed in this paper is a unique and comprehensive quantified model which considers difference between project success and project management success and all critical indices which can affect them.
引用
收藏
页码:526 / +
页数:18
相关论文
共 50 条
  • [1] The impact of contractors' attributes on construction project success: A post construction evaluation
    Alzahrani, Jaman I.
    Emsley, Margaret W.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (02) : 313 - 322
  • [2] Extension Comprehensive Evaluation on the Sustainable Development of the Large-scale Construction Project
    Wang Wei-ran
    Sai Yun-xiu
    Cai Jian-guo
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 927 - 933
  • [3] Development of a customer satisfaction evaluation model for construction project management
    Yang, Jyh-Bin
    Peng, Sheng-Chi
    [J]. BUILDING AND ENVIRONMENT, 2008, 43 (04) : 458 - 468
  • [4] The fuzzy comprehensive evaluation model based on industrial enterprise construction project ring
    Chen Xiaoming
    Li Qiming
    Wang Chao
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 475 - 479
  • [5] THE RELATIONSHIP BETWEEN SERVANT LEADERSHIP'S CHARACTERISTICS AND PROJECT SUCCESS AMONG CONTRACTORS IN CONSTRUCTION INDUSTRY
    Misran, Noraini Binti
    bin Othman, Ahmad
    [J]. INTERNATIONAL CONFERENCE ON MANAGEMENT (ICM 2011), 2011, : 867 - 884
  • [6] SUCCESS EVALUATION MODEL FOR PROJECT MANAGEMENT
    Doskocil, Radek
    Skapa, Stanislav
    Olsova, Petra
    [J]. E & M EKONOMIE A MANAGEMENT, 2016, 19 (04): : 167 - 185
  • [7] SUCCESS FACTORS FOR TAIWANESE CONTRACTORS COLLABORATING WITH LOCAL CHINESE CONTRACTORS IN CONSTRUCTION PROJECTS
    Kao, Chih-Han
    Huang, Cheng-Han
    Hsu, Mark Shu-Chien
    Tsai, I-Hung
    [J]. JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2016, 17 (06) : 1007 - 1021
  • [8] Success model of project management information system in construction
    Lee, Seul-Ki
    Yu, Jung-Ho
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 25 : 82 - 93
  • [9] Sustainable Comprehensive Evaluation of highway Construction Project Based on ANP-FCE Model
    Hu, Zhihua
    Zhang, Lei
    [J]. ADVANCES IN CIVIL INFRASTRUCTURE ENGINEERING, PTS 1 AND 2, 2013, 639-640 : 1269 - +
  • [10] Impact of project monitoring and evaluation practices on construction project success criteria in Ghana
    Kissi, Ernest
    Agyekum, Kofi
    Baiden, Bernard Kofi
    Tannor, Reuben Agyei
    Asamoah, George Effah
    Andam, Emmanuel Tweneboah
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (03) : 364 - 382