Opportunistic preventive maintenance scheduling for multi-unit reusable rocket engine system based on the variable maintenance task window method

被引:0
|
作者
Jin, Ping [1 ,2 ]
Chen, Zhiwei [1 ,2 ]
Li, Ruizhi [1 ,2 ]
Li, Yi [3 ]
Cai, Guobiao [1 ,2 ]
机构
[1] Beihang Univ, Sch Astronaut, Beijing 100191, Peoples R China
[2] Minist Educ, Key Lab Spacecraft Design Optimizat & Dynam Simul, Beijing, Peoples R China
[3] Beijing Inst Spacecraft Environm Engn, Beijing 100094, Peoples R China
关键词
Reusable rocket engine; Maintenance scheduling; Opportunistic maintenance; Imperfect maintenance; Variable maintenance task window; Reliability;
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
The reusable rocket engine (RRE), recognized as future propulsion system for space transportation, is composed of multiple components of which each one plays an essential role for the whole system. In rocket launches, these components are impaired by severe service conditions while the maintenance actions can only be executed in mission intervals. To program a reasonable maintenance scheme for the RRE system, an opportunistic preventive maintenance (PM) scheduling strategy is proposed: at the component-level, we evaluate the PM intervals dynamically by minimizing the maintenance cost rate over a life cycle under the reliability constraint where two imperfect maintenance actions: maintenance repair and replacement, are taken into account; at the system-level, a variable maintenance task window (VMTW) method is applied to dynamically rearrange maintenance actions when the maintenance opportunities arise. The novel strategy can effectively reduce the PM cost and avoid unnecessary depot maintenance. Its efficiency is validated by a comparison with traditional optimal preventive maintenance schedule derived from the genetic algorithm. (C) 2022 Elsevier Masson SAS. All rights reserved.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Opportunistic preventive maintenance scheduling for multi-unit reusable rocket engine system based on the variable maintenance task window method
    Jin, Ping
    Chen, Zhiwei
    Li, Ruizhi
    Li, Yi
    Cai, Guobiao
    AEROSPACE SCIENCE AND TECHNOLOGY, 2022, 121
  • [2] Opportunistic preventive maintenance scheduling for a multi-unit series system based on dynamic programming
    Zhou, Xiaojun
    Xi, Lifeng
    Lee, Jay
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (02) : 361 - 366
  • [3] Maintenance gravity window based opportunistic maintenance scheduling for multi-unit serial systems with stochastic production waits
    Zhou, Xiaojun
    Ning, Xiaohan
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 215
  • [4] An integrated framework of preventive maintenance and task scheduling for repairable multi-unit systems
    Zhang, Wenyu
    Gan, Jie
    He, Shuguang
    Li, Ting
    He, Zhen
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 247
  • [5] Reusable rocket engine preventive maintenance scheduling using genetic algorithm
    Chen, Tao
    Li, Jiawen
    Jin, Ping
    Cai, Guobiao
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 114 : 52 - 60
  • [6] Hybrid Preventive Maintenance and Inspection Scheduling for A Multi-Unit Series System
    Cheng, Zhijun
    Yang, Zheng
    Tan, Lin
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (QR2MSE), VOLS I-IV, 2013, : 626 - 631
  • [7] Optimizing opportunistic preventive maintenance strategy for multi-unit system of CNC lathe
    Wu, Yue
    Yang, Zhaojun
    Wang, Jili
    Chen, Xiaojuan
    Hu, Wei
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2022, 36 (01) : 145 - 155
  • [8] Optimizing opportunistic preventive maintenance strategy for multi-unit system of CNC lathe
    Yue Wu
    Zhaojun Yang
    Jili Wang
    Xiaojuan Chen
    Wei Hu
    Journal of Mechanical Science and Technology, 2022, 36 : 145 - 155
  • [9] Dynamic opportunistic preventive maintenance model for a multi-unit series system with consideration of imperfect maintenance effect
    Zhou, Xiao-Jun
    Shen, Wei-Bing
    Xi, Li-Feng
    Lee, Jay
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2007, 41 (05): : 769 - 773
  • [10] Opportunistic Preventive Maintenance Optimization for Multi-Unit Series Systems with Combing Multi-Preventive Maintenance Techniques
    周晓军
    陆志强
    奚立峰
    李杰
    JournalofShanghaiJiaotongUniversity(Science), 2010, 15 (05) : 513 - 518