共 50 条
- [1] FBR FUEL-CYCLE CAN BE COMPETITIVE [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1988, 33 (404): : 13 - &
- [2] FBR FUEL REPROCESSING PLANT TO BE BUILT [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1978, 23 (270): : 5 - 5
- [3] BRITAIN CONFIDENT ON FBR FUEL-CYCLE COSTS [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1984, 29 (362): : 22 - 26
- [4] DEVELOPMENT OF THE DIPRES PROCESS FOR THE FBR FUEL-CYCLE [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 47 : 193 - 194
- [5] ARGUMENTS FOR CLOSING THE FUEL-CYCLE BY REPROCESSING [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1983, 28 (02): : 75 - 80
- [6] DESIGN OF FBR FUEL ASSEMBLIES FOR A LOW-COST FUEL-CYCLE [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 47 : 191 - 193
- [7] REPROCESSING AND WASTE MANAGEMENT EXPERIENCE - PFR FUEL-CYCLE [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 40 : 117 - 120
- [8] DESIGN OF THE HERMES PILOT RESEARCH FACILITY FOR REPROCESSING OF FBR FUEL [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 40 : 113 - 114
- [9] ECONOMIC AND DEMONSTRATION POTENTIAL OF THE IFR FUEL-CYCLE [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 50 (NOV): : 208 - 209
- [10] PSA EXPERIENCE WITH FUEL-CYCLE PLANT [J]. NUCLEAR ENERGY-JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1993, 32 (06): : 363 - 367