Scientific and methodical approach to the estimation of the risk level of public-private partnership projects

被引:0
|
作者
Hrytsenko, L. L. [1 ,2 ]
机构
[1] Natl Bank Ukraine, Ukrainian Acad Banking, Econ, State Higher Educ Inst, Sumy, Ukraine
[2] Natl Bank Ukraine, Ukrainian Acad Banking, Banking Dept, State Higher Educ Inst, Sumy, Ukraine
关键词
state; business; public-private partnership; infrastructure; innovative project; risk; elasticity coefficient;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The aim of the article. The aim of the article is improvement of scientific and methodical approach to complex estimation of innovative projects risks through public-private partnership. The results of the analysis. Different models of state and business cooperation that are implemented through the public-private partnership are identified as an effective instrument of such special group of innovative projects as infrastructure projects. During the realization of public-private partnership such special features of infrastructure innovative projects as long-term and contractual character of relationships play one of the most important role. It becomes possible to implement using special forms of public-private partnership and financing models, realization of partner relation on competitive base, diversification of responsibility and risk between participants of public-private partnership. Risk of public-private partnership is recommended to identify as an economic category that characterizes probabilistic assessment of objective threat of losing by public-private partnership participants their material, financial, intellectual resources, subjectively expected revenue shortfall, creation of additional expenditures or any other deviations from the predicted parameters of efficiency. It can happen in a result of making decision about public and private sector cooperation during realization and in the result of changes in investment policy, innovative infrastructure projects innovation and investment environments. Realization of innovative projects in public-private partnership is connected with significant risks that occur at each stage of its realization and preparation. The long-term investments of innovative infrastructure projects, its high value and big quantity of participants, complex system of its financing and organizational structure cause that very urgent task in such projects realization is necessity of taking into account its investment risks and creation an effective management system. Scientific and methodical approach to the realization of comprehensive analysis and assessment of projects' risks hich are financed with resources of public and private partners is proposed. It provides a detailed study of individual innovative projects' risk and vertical analysis of these risks through the factors of its creation that are specific for public-private partnership. There is also an opportunity for these factors quantitative and qualitative identification on the base of the World Bank statistical indicators of innovative projects realization. Key stages of detailed researching of innovative projects' risks that are realized through the public-private partnership are following: formation of the information database for innovative projects' risks characterizing in dynamic; risks study on the base of the sensitivity analysis of factors appropriated for innovation projects' assessment; the result of this stage is formed model of the selected factors relationship and identification of major risk factors; innovative project risks assessment as a measure of the variability of results through the calculation of the average weighted module of deviation from the grouping center, the average weighted deviation from modal value, the average weighted deviation from optimal value, variance and standard deviation, semi-variation and semi-standard deviation. Vertical analysis of the innovative projects' risks includes the next procedure: formation of statistical database for innovative projects' risks characteristic; sensitivity analysis of innovative projects risks' factors as a set by the creation of risk factors econometric model and risk variables cohesion. This scientific and methodical approach gives an opportunity for comprehensive assessment of risk level of different factors during innovative projects investment process in public-private partnership. This one unlike existing approaches allows to take into account the specific factors for this form of state and business cooperation. Conclusions and directions of further researches. Developed scientific and methodical approach to the complex assessment of innovative projects' risks is oriented on identification of basic risk formation' factors. It allows to arise the quality of state investment policy creation taking into account the objective function and its variation as a result of factor changing. This approach is based on the use of econometric modeling of desired effect dependence e on the system of investment risks' formation factors. Also it allows to identify risk factors of public-private partnership' innovative projects with the aim to formate an adequate system of monitoring and resistance of its destructive influence. Directions of further researches is horizontal analysis of innovative projects' risks that can be systematized by the branches of the economy. Such analysis might be oriented on optimal risks distribution between partners while choosing among public-private partnership projects that are realized in different branches of economy.
引用
收藏
页码:96 / 106
页数:11
相关论文
共 50 条
  • [1] Risk Factors in IT Public-Private Partnership Projects
    Ghribi, Souhir
    Hudon, Pierre-Andre
    Mazouz, Bachir
    [J]. PUBLIC WORKS MANAGEMENT & POLICY, 2019, 24 (04) : 321 - 343
  • [2] Risk Allocation in Public-Private Partnership Projects
    Jin Xiaohua
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 326 - 330
  • [3] METHODICAL PRINCIPLES OF THE SYNERGETIC EFFECT IN THE IMPLEMENTATION OF INNOVATION PUBLIC-PRIVATE PARTNERSHIP PROJECTS
    Bikmetov, Evgeniy Yu.
    Zinnurov, Ulfat G.
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE CONTEMPORARY ISSUES IN THEORY AND PRACTICE OF MANAGEMENT: CITPM 2016, 2016, : 35 - 41
  • [4] Risk Misallocation in Public-Private Partnership Projects in China
    Ke, Yongjian
    Wang, Shouqing
    Chan, Albert P. C.
    [J]. INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2013, 16 (03) : 438 - 460
  • [5] Risk Management at Implementation of Social Projects of Public-Private Partnership
    Shubina, V., I
    Shemyatikhina, L. Y.
    Evseeva, M., V
    Shipitsyna, K. S.
    [J]. PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE - FAR EAST CON (ISCFEC 2020), 2020, 128 : 2370 - 2376
  • [6] RISK-MANAGEMENT OF PUBLIC-PRIVATE PARTNERSHIP INNOVATION PROJECTS
    Hrytsenko, Larysa
    Boiarko, Iryna
    Tverezovska, Oleksandra
    Polcyn, Jan
    Miskiewicz, Radoslaw
    [J]. MARKETING AND MANAGEMENT OF INNOVATIONS, 2021, (02): : 155 - 165
  • [7] A systematic approach for public-private partnership projects CSFs evaluation
    Wang, Liping
    Zhang, Pu
    Zhang, Pei
    Li, Rongbo
    Zhang, Yanke
    Wu, Yueqiu
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (09) : 1127 - 1145
  • [8] RISK ASSESSMENT AND MANAGEMENT PUBLIC-PRIVATE PARTNERSHIP PROJECTS IN THE FISHERIES
    Mnatsakanyan, Albert G.
    Ogiy, Oksana G.
    [J]. MARINE INTELLECTUAL TECHNOLOGIES, 2018, 3 (04): : 134 - 141
  • [9] Collaborative Risk Management for Public-Private Partnership Projects in Australia
    Zhang, Guomin
    Jin, XiaoHua
    Huang, Chunyan
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 432 - 437
  • [10] Revenue Risk Allocation Mechanism in Public-Private Partnership Projects: Swing Option Approach
    Zhang, Shuhua
    Li, Jinghuan
    Li, Yu
    Zhang, Xiaoling
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (01)