Research on coupling seepage field and stress field analyses of underwater shield tunnel

被引:0
|
作者
Xu Jin-hua [1 ,2 ]
He Chuan [1 ]
Xia Wei-yang [1 ]
机构
[1] Southwest Jiaotong Univ, Dept Underground Engn, Chengdu 610031, Sichuan, Peoples R China
[2] Guanggan Expressway Co Ltd, Guangyuan 628000, Peoples R China
关键词
underwater shield tunnel; seepage field; stress field; coupling analysis; FEM;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Seepage field has a great influence on stress field of shield tunnel structure during construction under high water pressure. The FEM has been used to analyze the coupling seepage field and stress field under different water pressures based on the drainage tunnel project crossing the Yangtze River at the downtown of Chongqing city. The segment's stress distribution, displacements and pore pressure distributions are calculated. Water pressure distributing rule has been studied emphatically; and the results are verified by the in-situ data. The calculation show that segments need to take more tensile force under coupling effect. The achieved results offer helpful reference and basis for design and construction of this project.
引用
收藏
页码:3519 / +
页数:5
相关论文
共 4 条
  • [1] CHAI Jun-rui, 2001, ROCK SOIL MECH, V22, P459
  • [2] [陈晓平 Chen Xiaoping], 2004, [岩土力学, Rock and Soil Mechanics], V25, P860
  • [3] Wang YaZhen, 1998, Journal of Northeast Forestry University, V26, P26
  • [4] YANG Lin-de, 1997, CHINESE J ROCK MECH, V16, P112