Health Risk Management which are effective on Human Health in High-rise Building construction projects with Fuzzy Approach

被引:0
|
作者
Ardeshir, A. [1 ]
Maknoon, R. [2 ]
Zadeh, M. Rekab Island [2 ,3 ]
Jahantab, Z.
机构
[1] Amirkabir Univ Technol, Enviro Res Ctr, Dept Civil & Environm Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Civil & Environm Engn, Tehran, Iran
[3] Islamic Art Univ Tabriz, Dept Architecture, Tabriz, Iran
关键词
High-rise building Risk; Health; Fuzzy numbers; Risk Assessment; Construction; Risk management;
D O I
暂无
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
Introduction: Due to the increasing population and the need for setting in cities, we witness an increase in high-rise building in Iran. Moreover, because of the ambiguity and complexity, they have various risks potential. Health problems are among this risks for the residents. These risks have short term or long term effects,which can cause illness or even death. Material and Method: In the present study, health risks in high-rise buildings are identified, assessed and ranked. Health issue are identified by conducting interview with experts in high-rise building an using specific health and safety related checklists. Due to ambiguous nature of risks and existence of uncertainly, fuzzy logic technique with trapezoidal distribution was used for quantification. Finally, after risk evaluation and calculation of critical degree of each risk, the risks were ranked. Result: Risk factors obtained over 0.5 for most of the risks that indicate the importance of Health in high-rise projects during construction phase. The results also showed that the health risks should be assessed before the start of the project in order to reduce or eliminate their impacts. Conclusion: Safety risks in High-rise Building projects is very important. These risks have many impacts directly and indirectly on the time, quality and costs of projects. Therefore, evaluating and controlling each health risk in the design and implementation phases are essential. Most of the risks factors identified in this study, can be prevented by using personal protective equipment. The role of the training people involved in this projects are essential to use personal protective equipment.
引用
收藏
页码:69 / +
页数:13
相关论文
共 50 条
  • [1] Critical Success Factors for Safety Management of High-Rise Building Construction Projects in China
    Li, Yadi
    Ning, Yan
    Chen, Wei Tong
    [J]. ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [2] An Analysis of the Control Points in the High-rise Building Construction Management
    Fan, Yong
    Shi, Ke Bin
    [J]. SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT, PTS 1-3, 2012, 209-211 : 1389 - 1395
  • [3] Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects
    Yang, Yi
    Pan, Mi
    Pan, Wei
    Zhang, Zhiqian
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (03)
  • [4] Multimethod Supply Chain Simulation Model for High-Rise Building Construction Projects
    Jung, Minhyuk
    Park, Moonseo
    Lee, Hyun-Soo
    Chi, Seokho
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (03)
  • [5] Designing Human Health Risk Management Model for Dam Construction Projects
    Ghorbanalipour, R.
    Ahmadvand, A. M.
    Ahmadvand, M.
    Eghbali, H.
    [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (09): : 2173 - 2185
  • [6] A study on the risk management based on the procedure for high-rise multi-purpose building projects in Korea
    Fang, Guangxiu
    Paek, Joon H.
    [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2009, 42 (12): : 177 - 182
  • [7] Safety management in construction project. High-rise residential building
    Lehtinen, Jari
    [J]. VTT Tiedotteita - Valtion Teknillinen Tutkimuskeskus, 2000, (2049): : 3 - 77
  • [8] LEAN AND AGILE MANAGEMENT SYNERGY IN CONSTRUCTION OF HIGH-RISE OFFICE BUILDING
    Nowotarski, P.
    Paslawski, J.
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2016, 62 (04) : 133 - +
  • [9] Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects
    Yang, Yi
    Pan, Mi
    Pan, Wei
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (06)
  • [10] Modeling labor productivity in high-rise building construction projects using neural networks
    Nguyen, Duc Anh
    Tran, Dung Quang
    Nguyen, Thoan Ngoc
    Tran, Hai Hong
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 675 - 692