共 50 条
- [1] BANKERS TRUST PLAZA NEW YORK CITY - HIGH-RISE OFFICE BUILDING WITH A SYSTEMS APPROACH TO SMOKE AND FIRE CONTROL [J]. ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1973, 15 (08): : 61 - 63
- [2] SMOKE AND FIRE CONTROL IN HIGH-RISE BUILDINGS .1. STUDIES OF NEW-YORK CITY FIRE TESTS [J]. ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1973, 15 (05): : 33 - 33
- [3] Study on Smoke Control Strategy in a High-rise Building Fire [J]. 2013 INTERNATIONAL CONFERENCE ON PERFORMANCE-BASED FIRE AND FIRE PROTECTION ENGINEERING (ICPFFPE 2013), 2014, 71 : 145 - 152
- [4] Study on Vertical Combination Smoke Control Model in High-rise Building Fire [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 741 - 745
- [5] Evaluation of smoke harm and fatalness in high-rise building fire [J]. Harbin Gongye Daxue Xuebao, 2006, 3 (392-394+409):
- [6] FDS Research on Smoke Control in the Stair Enclosure of a High-rise Building Fire Event [J]. 2009 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT TECHNOLOGY, VOL 3, PROCEEDINGS, 2009, : 70 - +
- [7] A high-rise building fire [J]. FOURTH CONFERENCE ON TALL BUILDINGS IN SEISMIC REGIONS, PROCEEDINGS: TALL BUILDINGS FOR THE 21ST CENTURY, 1997, : 427 - 428
- [10] The effect of damper leakage and fire size on the performance of smoke control system in high-rise building [J]. Journal of Mechanical Science and Technology, 2017, 31 : 4029 - 4034