COMPLEXITY OF SCHEDULING TASKS WITH TIME-DEPENDENT EXECUTION TIMES

被引:92
|
作者
HO, KIJ [1 ]
LEUNG, JYT [1 ]
WEI, WD [1 ]
机构
[1] UNIV NEBRASKA LINCOLN,DEPT COMP SCI & ENGN,LINCOLN,NE 68588
关键词
NP-COMPLETE; ALGORITHMS; POLYNOMIAL-TIME ALGORITHM; NONPREEMPTIVE SCHEDULE; RELEASE TIME; DEADLINE; FEASIBLE SCHEDULE; SINGLE PROCESSOR;
D O I
10.1016/0020-0190(93)90175-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A new model of task system in which the execution time of a task depends on its starting time is considered. It is shown that the feasibility problem on a single processor is NP-complete for a set of tasks with identical release times and two distinct deadlines. An O(n log n)-time algorithm is given for a set of tasks with identical release times and deadlines. These two results give a sharp boundary delineating the complexity of the problem.
引用
收藏
页码:315 / 320
页数:6
相关论文
共 50 条