750 MW STEAM TURBINE-GAS TURBINE PLANT OF THE HEAT-RECOVERY TYPE OPERATING ON NATURAL-GAS

被引:0
|
作者
CHERNETSKII, NS
OLKHOVSKII, GG
BEREZINETS, PA
KHARKIN, YA
BIRYUKOV, AN
BOREVSKII, EI
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:636 / 640
页数:5
相关论文
共 50 条
  • [1] STEAM TURBINE-GAS TURBINE PLANT FOR COMBINED GENERATION OF HEAT AND POWER
    KHRISTIANOVICH, SA
    MASLENNIKOV, VM
    SHTERENBERG, VY
    [J]. THERMAL ENGINEERING, 1973, 20 (07) : 62 - 68
  • [2] FEATURES OF OPERATION OF THE ONCE-THROUGH BOILER IN THE 800 MW STEAM TURBINE-GAS TURBINE PLANT OF WASTE-HEAT RECOVERY TYPE
    BEREZINETS, PA
    SOTNIKOV, IA
    ERSHOV, YA
    KONDRATEVA, GS
    [J]. THERMAL ENGINEERING, 1985, 32 (09) : 499 - 502
  • [3] INFORMATION SYSTEM FOR CONTROL OF A 200 MW UNIT-TYPE STEAM TURBINE-GAS TURBINE PLANT
    SHORNIKOV, EA
    TINKER, EM
    SOSINOVICH, VA
    [J]. THERMAL ENGINEERING, 1969, 16 (11) : 29 - +
  • [4] FEATURES OF OPERATION OF THE ONCE-THROUGH BOILER IN THE 800 MW STEAM TURBINE-GAS TURBINE PLANT OF WASTE-HEAT RECOVERY TYPE.
    Berezinets, P.A.
    Sotnikov, I.A.
    Ershov, Yu.A.
    Kondrat'eva, G.S.
    [J]. Thermal Engineering (English translation of Teploenergetika), 1985, 32 (09): : 499 - 502
  • [5] IMPROVING STEAM TURBINE-GAS TURBINE PLANTS
    KIRILLOV, II
    ARSENEV, LV
    KHODAK, EA
    ROMAKHOVA, GA
    [J]. THERMAL ENGINEERING, 1979, 26 (11) : 631 - 635
  • [6] PILOT STEAM TURBINE-GAS TURBINE PLANT WITH GASIFICATION OF COAL IN THE CYCLE
    MARKOV, NM
    PRUTKOVSKII, EI
    KORSOV, YG
    CHAVCHANIDZE, EK
    [J]. THERMAL ENGINEERING, 1985, 32 (09) : 492 - 498
  • [7] A 250 MW STEAM TURBINE-GAS TURBINE PLANT WITH A WASTE-HEAT BOILER WHICH IS EFFICIENT AND ADAPTABLE TO LOAD CHANGES
    OLKHOVSKII, GG
    CHERNETSKII, NS
    BORODIN, AA
    GUSEV, VN
    SVYATOV, VA
    [J]. THERMAL ENGINEERING, 1986, 33 (03) : 115 - 118
  • [8] INTRODUCTION OF A 200 MW STEAM TURBINE-GAS TURBINE GENERATING UNIT AND PROSPECTS FOR USE OF STEAM TURBINE-GAS TURBINE PLANTS OF HIGH-CAPACITY FOR POWER-GENERATION
    MARKOV, NM
    PRUTKOVSKII, EN
    DEMIRCHYAN, KG
    BACHILO, LL
    FEDOSYUK, AF
    KROKHIN, VA
    [J]. THERMAL ENGINEERING, 1975, 22 (06) : 38 - 41
  • [9] EXPERIENCE OF COMMISSIONING THE 250-MW PROTOTYPE STEAM TURBINE-GAS TURBINE UNIT
    BOTVINOV, VP
    KIOR, GP
    GUSTI, IP
    SMOKOV, TI
    SIVART, AA
    YURASOV, AM
    [J]. THERMAL ENGINEERING, 1984, 31 (10) : 555 - 558
  • [10] POWER GENERATING STEAM TURBINE-GAS TURBINE PLANT FOR COVERING PEAK LOADS
    MASLENNIKOV, VM
    SHTERENBERG, VY
    [J]. THERMAL ENGINEERING, 1974, 21 (04) : 82 - 88