Mathematical Models for a Batch Scheduling Problem to Minimize Earliness and Tardiness

被引:10
|
作者
Ogun, Basar [1 ]
Alabas-Uslu, Cigdem [2 ]
机构
[1] Eczacibasi Yapi Gerecleri Furniture Plant, Istanbul, Turkey
[2] Marmara Univ, Dept Ind Engn, Istanbul, Turkey
关键词
batch scheduling; earliness and tardiness; mixed integer programming formulation; on-time delivery;
D O I
10.3926/jiem.2541
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose: Today's manufacturing facilities are challenged by highly customized products and just in time manufacturing and delivery of these products. In this study, a batch scheduling problem has been addressed to enable on-time completion of customer orders in a lean manufacturing environment. The problem is optimizing the partitioning of product components into batches and scheduling of the resulting batches where each customer order is received as a set of products made of various components. Design/methodology/approach: Three different mathematical models for minimization of total earliness and tardiness of customer orders are developed to provide on-time completion of customer orders and also, to avoid excess final product inventory. The first model is a non-linear integer programming model whereas the second is a linearized version of the first. Finally, to solve larger sized instances of the problem, an alternative linear integer model is presented. Findings: Computational study using a suit set of test instances showed that the alternative linear integer model is able to solve all test instances in varying sizes within quite shorter computer times compared to the other two models. It has also been showed that the alternative model is able to solve moderate sized real-world problems. Originality/value: The problem under study differentiates from existing batch scheduling problems in the literature owing to the inclusion of new circumstances that are present in real-world applications. Those are: customer orders consisting of multi-products made of multi-parts, processing of all parts of the same product from different orders in the same batch, and delivering the orders only when all related products are completed. This research also contributes to the literature of batch scheduling problem by presenting new optimization models.
引用
收藏
页码:390 / 405
页数:16
相关论文
共 50 条
  • [1] Scheduling a Fuzzy Flowshop Problem to Minimize Weighted Earliness-tardiness
    Yan, Ping
    Jiao, Ming-hai
    Zhao, Li-qiang
    [J]. 2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 2736 - 2740
  • [2] ON SCHEDULING TO MINIMIZE EARLINESS - TARDINESS AND BATCH DELIVERY COSTS WITH A COMMON DUE-DATE
    HERRMANN, JW
    LEE, CY
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) : 272 - 288
  • [3] Earliness and tardiness scheduling problems on a batch processor
    Qi, XT
    Tu, FS
    [J]. DISCRETE APPLIED MATHEMATICS, 1999, 98 (1-2) : 131 - 145
  • [4] Scheduling in a Simple Assembly Robotics Cell to Minimize Earliness and Tardiness
    Munoz-Guevara, John Andres
    Villegas-Florez, Jairo Alberto
    Jaramillo-Tabima, Jhannier Jhoan
    [J]. INGENIERIA, 2024, 29 (02):
  • [5] Bounds for the permutation flowshop scheduling problem with exact time lags to minimize the total earliness and tardiness
    Hamdi, Imen
    Loukil, Taicir
    [J]. INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2014, 5 (02): : 47 - 57
  • [6] Look ahead batching to minimize earliness/tardiness measures in batch processes
    Gupta, AK
    Iyer, SA
    Ganesan, VK
    [J]. 2004 IEEE CONFERENCE ON ROBOTICS, AUTOMATION AND MECHATRONICS, VOLS 1 AND 2, 2004, : 1101 - 1106
  • [7] Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs
    Toksari, M. Duran
    Guner, Ertan
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2010, 21 (06) : 843 - 851
  • [8] Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs
    M. Duran Toksarı
    Ertan Güner
    [J]. Journal of Intelligent Manufacturing, 2010, 21 : 843 - 851
  • [10] Online scheduling to minimize total weighted (modified) earliness and tardiness cost
    Jabbari, Arman
    Kaminsky, Philip M.
    [J]. JOURNAL OF SCHEDULING, 2021, 24 (04) : 431 - 446