A framework for the evaluation of turnaround maintenance projects

被引:9
|
作者
Obiajunwa, Christopher [1 ]
机构
[1] Syngenta Ltd GMC, Grangemouth, Scotland
关键词
Project management; Turnaround maintenance project; Success evaluation; Success measurement criteria; United Kingdom;
D O I
10.1108/13552511211281543
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The aim of this study is to establish a framework with which process plants can evaluate the performance of their turnaround maintenance (TAM) projects at the end of the event without making reference to previous events. Design/methodology/approach - This is a case study. The study involved the case studies of six process plants in the UK. Three sources of evidence were used in this study including; interviews, direct observation and official documents. Findings - The case studies show that TAM projects can be evaluated by assessment of the management performance and the resultant benefits realised. The uses of generic project success measures are not very adequate for TAM. Practical Implications - The study developed success measurement criteria for TAM projects. Instead of comparing performance of TAM projects with previous ones to assess how successful the outcome is, organisations can evaluate their TAM project's performance based on the current TAM using the criteria developed in the framework. In addition, these success criteria will enable the organisation to evaluate the benefits expected from the TAM project outcome at hand-over of the plant from the TAM project management to the operations management. Originality/value - Operators of process plants and hence engineering facilities still measure the outcome of TAM using measures that are generic for EPC projects. Considering the peculiar nature of TAM, this study has developed success measurement criteria for TAM projects specifically.
引用
收藏
页码:368 / +
页数:17
相关论文
共 50 条
  • [1] Skills for the management of turnaround maintenance projects
    Obiajunwa, Christopher
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2013, 19 (01) : 61 - +
  • [2] Improving labour productivity in process construction maintenance and shutdown/turnaround projects
    Hwang, Bon-Gang
    Krishnankutty, Pramesh
    Zhu, Lei
    Caldas, Carlos H.
    Shounak, Arjun
    Mulva, Stephen
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 822 - 836
  • [3] Optimize turnaround projects
    Buckner, E
    [J]. HYDROCARBON PROCESSING, 2005, 84 (09): : 55 - 58
  • [4] A FRAMEWORK FOR CLASSIFYING RISKS IN ERP MAINTENANCE PROJECTS
    Lopez, Cristina
    Salmeron, Jose L.
    [J]. 2011 PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON E-BUSINESS (ICE-B 2011), 2011, : 201 - 204
  • [5] Status of Integrated Turnaround Maintenance
    Duffuaa, Salih O.
    Al-Turki, Umar M.
    Ben Daya, Mohammed
    [J]. 2019 INDUSTRIAL & SYSTEMS ENGINEERING CONFERENCE (ISEC), 2019,
  • [6] Turnaround strategies for maintenance departments
    ITC Bhadrachalam Paperboards Ltd., Sarapaka-507 128 Dist Khammam , India
    [J]. IPPTA, 3 (15-25):
  • [7] Reducing turnaround scope on capital projects
    Payami, Houman
    [J]. ENR (Engineering News-Record), 2019, 282 (07):
  • [8] Workflow Automation in a Risk Management Framework for Pavement Maintenance Projects
    Benta, D.
    Lucia, R.
    Manolescu, M. -J.
    [J]. INTERNATIONAL JOURNAL OF COMPUTERS COMMUNICATIONS & CONTROL, 2017, 12 (02) : 155 - 165
  • [9] Framework for tool evaluation for a maintenance environment
    Vierimaa, Matias
    Taramaa, Jorma
    Puustinen, Heli
    Suominen, Kati
    Ketola, Tommi
    [J]. Journal of Software Maintenance, 1998, 10 (03): : 203 - 224
  • [10] Framework for tool evaluation for a maintenance environment
    Vierimaa, M
    Taramaa, J
    Puustinen, H
    Suominen, K
    Ketola, T
    [J]. JOURNAL OF SOFTWARE MAINTENANCE-RESEARCH AND PRACTICE, 1998, 10 (03): : 203 - 224