Research progress on safety risk management for large scale geotechnical engineering construction in China

被引:0
|
作者
Xiong Zi-ming [1 ,2 ]
Lu Hao [1 ]
Wang Ming-yang [1 ,2 ]
Qian Qi-hu [1 ]
Rong Xiao-li [2 ]
机构
[1] Army Engn Univ PLA, State Key Lab Disaster Prevent & Mitigat Explos &, Nanjing 210007, Jiangsu, Peoples R China
[2] Nanjing Univ Sci & Technol, Sch Mech Engn, Nanjing 210094, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
geotechnical engineering; risk management; risk analysis; risk evaluation; risk monitoring; risk early warning;
D O I
10.16285/j.rsm.2017.2138
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Geotechnical engineering in China including urban rail transit, highway, high-speed rail construction, hydraulic engineering is featured by large scale, long construction period, complex operation and frustrating situations regarding project safety. Various accidents have been reported from time to time, resulting in serious social impact and huge economic loss. This paper presents the main progress in the safety risk management of geotechnical engineering in China from 2010 to 2017, including (1) national major scientific and technological projects, achievement awards, specifications for safety risk management; (2) safety risk analysis and evaluation method of large geotechnical engineering; (3) safety risk monitoring and early warning of large-scale geotechnical engineering construction; (4) information technology and platform of construction safety risk management of large geotechnical engineering; (5) the intelligent analysis and control of construction safety of large geotechnical engineering. Based on the analysis of the above research progress in China, new challenges in the safety risk management for geotechnical engineering are identified as follows: (1) application and promotion of quantitative risk assessment theory and technology; (2) risk decision theory; (3) the implementation of the whole-process safety risk management plan; (4) shared platform for the construction of safety accidents in geotechnical engineering; (5) analysis and control of geotechnical engineering parameters based on big data mining technology; (6) research and construction of intelligent geotechnical engineering.
引用
收藏
页码:3703 / 3716
页数:14
相关论文
共 61 条
  • [1] [Anonymous], 2012, CHIN J ROCK MECH ENG
  • [2] [白继文 Bai Jiwen], 2015, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V34, P2327
  • [3] BLOCH ARTHUR, 2012, MURPHYS LAW
  • [4] Chen GQ, 2010, ROCK SOIL MECH, V31, P3012
  • [5] [丁烈云 Ding Lieyun], 2013, [土木工程学报, China Civil Engineering Journal], V46, P141
  • [6] Failure Mode of the Water-filled Fractures under Hydraulic Pressure in Karst Tunnels
    Dong, Xin
    Lu, Hao
    Huang, Houxu
    Hao, Yiqing
    Xia, Yuanpu
    [J]. OPEN GEOSCIENCES, 2017, 9 (01): : 186 - 196
  • [7] Decision-Making Model under Risk Assessment Based on Entropy
    Dong, Xin
    Lu, Hao
    Xia, Yuanpu
    Xiong, Ziming
    [J]. ENTROPY, 2016, 18 (11)
  • [8] DU Xiu-li, 2010, CHINA CIVIL ENG J S2, V43, P353
  • [9] Du Y, 2015, ROCK SOIL MECH, V36, P2284, DOI 10.16285/j.rsm.2015.08.022
  • [10] Gu L.Y., 2014, CHIN J ROCK MECH ENG, V33, P4153, DOI [10.13722/j.cnki.jrme.201, DOI 10.13722/J.CNKI.JRME.201]