PROBABILISTIC PRODUCTION COSTING SIMULATION OF A THERMAL SYSTEM WITH A PUMPED-STORAGE POWER-PLANT

被引:0
|
作者
HOFFER, J
机构
[1] Laboratory of Operations Research and Decision Systems, Computer and Automation Institute, Hungarian Academy of Sciences, Budapest, H-1518
基金
匈牙利科学研究基金会;
关键词
GENERATION SYSTEM RELIABILITY; PRODUCTION COSTING; PLANNING OF PUMPED-STORAGE OPERATION;
D O I
10.1016/0142-0615(95)00043-P
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The paper presents a model and two algorithms for the calculation of the additional pumping generation of thermal power plants and the discharging energy of a pumped storage power plant in a thermal system. Both algorithms lean to the solution of a univariate global optimization problem. One of these problems provides an optimal result. The other is suboptimal, as it is based on a lower estimation for rite absolute value of the derivative of the equivalent load duration curve. The proposed algorithms can be applied within any loan duration curves based probabilistic method, and the practical solution of any of these problems depends on the type of convolution method used. The pitfalls of using load duration curves is well known from the literature, therefore the proposed methods can be used only for medium- and long-term planning purposes, and rite results do not have operative meaning for the subperiods of the planning horizon.
引用
收藏
页码:251 / 256
页数:6
相关论文
共 50 条